Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityClosing soon

CO NP BLCA 10(1) South Rim Drive

TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI

Response deadlineOct 8, 2026 4:00 PM EDT · 2 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Oct 8, 2026 4:00 PM EDT · 2 days left
Posted
Oct 1, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Montrose, Colorado
Current status
Closing soon

Notice details

Official status
Closing soon
Normalized group
Bid opportunity
Notice ID
8017030241ca445f932342aaaafee2ad
Solicitation number
6982AF26Q000022

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Oct 3, 2026 2:49 AM EDT.

This is a Request for Quote. Plans and specifications are available. PROJECT NUMBER: CO NP BLCA 10(1) PROJECT NAME: South Rim Drive Improvement PROJECT DESCRIPTION: The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons. SCOPE OF THE WORK: The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve (12) distinct locations along South Rim Drive. Principal work elements include, but are not limited to, the following: Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries. Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement. Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings). Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors. Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction. To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway. ANTICIPATED SCHEDULE: Advertisement: Mid-September 15, 2026 Award: Mid-October 2026 Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter) Construction: Early April 2027 – Late May 2027 ESTIMATED COST RANGE: The estimated bid range for Schedule A is between $700,000 and $2,000,000.

Attachments

7 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Denise Martinez
Primary
CFLAcquisitions@dot.gov
Jorey Deml
Secondary
CFLAcquisitions@dot.gov

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.