4310--610 - COMPRESSORS Boiler Plant Bldg 76 - ENGINEERING, NIHCS Amendment to Answer Contractor Questions

VETERANS AFFAIRS, DEPARTMENT OF › 250-NETWORK CONTRACT OFFICE 10 (36C250)

Response deadlineSep 10, 2026 4:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 10, 2026 4:00 PM EDT
Posted
Aug 24, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
238220
PSC
4310
Place of performance
Marion, Indiana
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
780fb35d81af4fe880c5c2fc248ff38b
Solicitation number
36C25026Q0889

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 25, 2026 5:16 PM EDT.

RFQ 36C25026Q0889 Questions and Answers The solicitation references both VAAR 852.219-75 and 852.219-76 regarding the Limitations on Subcontracting certification. Which certification must be completed and submitted with our quotation, and where can we obtain the required form? Answer: The VARR references concerning the Limitations on Subcontracting were mistakenly put in the RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. How will the limitation on subcontracting be calculated for this requirement, considering that it includes equipment, materials, removal, installation, electrical and mechanical connections, and startup services? Answer: Limitations on subcontracting are not pertinent to this RFQ. All mentions of VAAR 852.219-75 and VAAR 852.219-76 have been removed from the RFQ. The site-visit RSVP deadline is listed as Friday, August 29, 2026, but August 29 falls on a Saturday. Is the correct RSVP deadline Friday, August 28, or Saturday, August 29? Also, is attendance at the site visit mandatory to submit a responsive quotation? Answer: The site-visit RSVP deadline is Friday, August 28, 2026. Attendance at the site visit is not mandatory. The Statement of Work identifies the RA-11I Fixed Speed 4 11KW compressor. Is this exact manufacturer and model required, or will an equal compressor meeting or exceeding the listed horsepower, PSI, CFM, electrical, and operational requirements be accepted? Answer: All mention of any manufacturer verbiage has been removed from the RFQ. If an equivalent product is permitted, are there any additional specifications that must be met, including voltage, phase, tank size, dryer requirements, controls, connection sizes, or required manufacturer certifications? Answer: There is no longer any mention of any exact manufacturer. The solicitation requires a manufacturer authorization letter when the prime contractor is not the manufacturer. Will a letter from the manufacturer confirming that our proposed supplier or installing subcontractor is an authorized dealer or distributor satisfy this requirement, or must the letter specifically name V Notary Service LLC as the authorized seller? Answer: As stated in the RFQ, if a contractor is not the manufacturer of the products being offered, they must provide a letter/memo from the manufacturer stating they are authorized to sell/distribute the manufacturer s products. A letter/memo stating a subcontractor is authorized to sell/distribute the manufacturers products is not sufficient. The delivery schedule lists September 30, 2026, while the period of performance is October 1 through October 31, 2026. Should the two compressors and startup kits be delivered by September 30, with removal and installation performed during October? Answer: Any mention of a period of performance has been removed. The contractor is required to complete the three (3) line items in the RFQ 60 days after receipt of the order (ARO). Please confirm whether any bid bond, payment bond, performance bond, prevailing-wage determination, or special insurance coverage is required for this procurement. Answer: There is no requirement for any bid bond, payment bond, performance bond, prevailing wage determination, or special insurance coverage required for this requirement. Will payment be issued after the complete installation and acceptance of both compressors, or may the contractor invoice separately for delivered equipment and completed installation milestones? Answer: Payment will be made after the delivery, installation and acceptance of the products. Progress payments are not authorized.

Attachments

4 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Timothy L. Garrity
Primary — Contract Specialist
timothy.garrity@va.gov
Phone: (480) 686-5349

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Review before pursuing

We found a requirement that may limit who can compete. Review the solicitation details before proceeding.

Detected in

  • Description“authorization letter when the prime contractor is not the manufacturer. Will a letter from the manufacturer confirming that our proposed supplier or installing subcontractor is an authorized dealer or distributor satisfy”

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.