Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
OtherClosed

Overhaul the C-5 Vaneaxial Fan

DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA8118 AFSC PZABB

Response deadlineSep 30, 2026 4:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 30, 2026 4:00 PM EDT
Posted
Sep 15, 2026 12:00 AM EDT
Notice type
Presolicitation
Set-aside
Not provided or not applicable
PSC
4140 — Fans, Air Circulators, and Blower Equipment
Place of performance
Oklahoma
Current status
Closed

Notice details

Official status
Closed
Normalized group
Other
Notice ID
c5b6534cfd7d40daafe8a86e2a8b878b
Solicitation number
FD20302501721

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 16, 2026 10:23 PM EDT.

The United States Air Force, through the Air Force Sustainment Center (AFSC), Tinker AFB 73145, is contemplating awarding a contract to Overhaul the C-5 Vaneaxial Fan. The contractor shall provide all labor, facilities, equipment, and material necessary to accomplish the remanufacture. The work encompasses disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing actions required to return the item to a like-new condition in accordance with the solicitation requirements and all associated attachments.

Attachments

2 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Rod Harris
Primary
rodrick.harris@us.af.mil
Mark Green
Secondary
mark.green.29@us.af.mil
Phone: 4057395000

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Review before pursuing

We found a requirement that may limit who can compete. Review the solicitation details before proceeding.

Detected in

  • Solicitation document“l be provided along with the required supporting documentation noted on page two of the form for each kind of request. When completed and coordinated by DCMA representative, the Contractor shall submit the form to the PC”
  • Solicitation document“ion baseline for an end item or system unless otherwise stated in this PWS. 1.9.5. The Contractor shall only use replacement parts purchased directly from the end item OEM, OEM-authorized distributor where the OEM remain”

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.