Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
OtherOpen

CO OMAD 300(71) Minuteman Missile Access

TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI

Response deadlineOct 16, 2026 4:00 PM EDT · 9 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Oct 16, 2026 4:00 PM EDT · 9 days left
Posted
Oct 1, 2026 12:00 AM EDT
Notice type
Presolicitation
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Cheyenne, Wyoming
Current status
Open

Notice details

Official status
Open
Normalized group
Other
Notice ID
e6ce7a2f0949412d95eb0cf685855c08
Solicitation number
6982AF27B000010

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Oct 3, 2026 2:49 AM EDT.

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: CO OMAD 300(71) PROJECT NAME: Minuteman Missile Access PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 73 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations. The project will be procured under the FPVS (Fixed-Price Variable Scope) contracting method and includes up to 85.75 miles of variable scope roadway reconditioning and re-graveling, and up to 73 culverts of variable scope in length. The project PS&E will provide a prioritized schedule of roadways to be improved that includes roadway reconditioning and re-graveling of existing aggregate surface roads within the existing roadway bench; as well as the replacement of up to 73 culverts. PRINCIPAL WORK ITEMS: 67001-0000 Project Lump Sum (Section 152 – Survey and Staking Drainage Structure) 67001-0000 Project Lump Sum (Section 153 – Contractor Quality Control) 67001-0000 Project Lump Sum (Section 602 – Pipe Culvert) 67001-0000 Project Lump Sum (Section 301 – Aggregate Surface Course) ANTICIPATED SCHEDULE: Advertisement – October 2026 Award-December - 2026 Construction – April 2027 through September 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000

Attachments

No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.

Contacts

Eric Grosskreuz
Primary
CFLcontracts@dot.gov
Leslie N. Karsten
Secondary
CFLcontracts@dot.gov

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.