Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- SOLICITATION

DEPT OF DEFENSE › DEPT OF THE ARMY › W07V ENDIST ROCK ISLAND

Response deadlineSep 16, 2026 12:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 16, 2026 12:00 PM EDT
Posted
Aug 31, 2026 12:00 AM EDT
Notice type
Solicitation
Set-aside
8(a) Set-Aside (FAR 19.8)
NAICS
237110
PSC
Y1NZ
Place of performance
Arlington Heights, Illinois
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
f1f292b80e694f999355e40d60e6a7cb
Solicitation number
W912EK26BA017

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 1, 2026 10:24 PM EDT.

8/31/2026 This notice was temporarily deactivated by the PIEE system. No changes to due dates or status - the amendmemnt on PIEE is merely the reactivation of this notice. The US Army Corps of Engineers - Rock Island District is soliciting competitive 8(a) bids under RFO Part 14 for subject requirement. The work is located at the Arlington Heights 88th Readiness Division, COL. P. Schulstad U.S. Army Reserve Center, with a physical address of 1515 West Central Road, Arlington Heights, Cook County, Illinois, and as indicated. All bids must be submitted via PIEE Solicitation Module. No emailed bids will be accepted. All files are posted to the Solicitaton module, use the link bellow to access them and be sure to follow this notice for all email updates. Base Bid The Base bid work includes, but is not limited to, demolition; directional drilling; excavation; providing a water service and main lines; providing gate valves, vaults, meters, and boxes; chlorination testing of the new water system; removing and capping fire hydrants; providing new fire hydrants; HMA patching of ACC pavement; repairing concrete sidewalks and drives; investigating and repairing a section of leaking previously abandoned watermain; seeding disturbed areas; and site restoration. Option A The work for Option A includes, but is not limited to, demolition; directional drilling; excavation; providing a new water connection to the Village of Arlington Heights watermain; plugging and capping the existing connection; providing gate valves, vaults, meters, and boxes; chlorination testing of the new water system; repairing concrete sidewalk; seeding disturbed areas; and site restoration. Option B The work for Option B includes, but is not limited to, demolition; directional drilling; excavation; providing a new water connection to the Village of Arlington Heights watermain; providing a water service and mainlines; providing gate valves, vaults, meters, and boxes; chlorination testing of the new water system; repairing concrete sidewalk; investigating existing storm sewer under Central Road; seeding disturbed areas; and site restoration.

Contacts

Jocelyn Rain
Primary
jocelyn.w.rain@usace.army.mil
Phone: 3097945709
Nicholas Moore
Secondary
nicholas.m.moore@usace.army.mil

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.