Bid opportunityClosed
Mississippi River & Tributaries, Morganza to the Gulf, Upper Reach F – Falgout Canal Road to Bayou Grand Caillou Flood Gate Structure – Stage 1 Levee Lift Sta. 2280+28 to Sta. 2130+00, Terrebonne Parish, Louisiana
DEPT OF DEFENSE › DEPT OF THE ARMY › W07V ENDIST NEW ORLEANS
Response deadlineSep 16, 2026 11:00 AM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 16, 2026 11:00 AM EDT
- Posted
- Sep 9, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- PSC
- Y1PZ — Construction Of Other Non-Building Facilities
- Place of performance
- Louisiana
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Bid opportunity
- Notice ID
- 2955088031a34d0eb896709a69d47401
- Solicitation number
- W912P826BA050
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 10, 2026 10:24 PM EDT.
MORGANZA TO THE GULF, LOUISIANA REACH F UPPER CONTRACT 1, TERREBONNE PARISH, LOUISIANA THIS SOLICITATION IS ISSUED AS UNRESTRICTED. THE NAICS CODE FOR THIS PROCUREMENT IS 237990. THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $25,000,000 AND $100,000,000. IN ACCORDANCE WITH RFO 22.502-2(D), AN EXCEPTION HAS BEEN GRANTED FOR THE USE OF A PROJECT LABOR AGREEMENTS AS REQUIRED UNDER RFO 22.502-1. THEREFORE, A PROJECT LABOR AGREEMENT IS NOT REQUIRED FOR THIS ACQUISITION. THE WORK CONSISTS OF CLEARING AND GRUBBING, EXCAVATION, DEGRADING EXISTING LEVEE, PLACEMENT OF EMBANKMENT AND HIGH STRENGTH GEOTEXTILE, ACCESS ROAD WIDENING, SURFACING WITH GEOTEXTILE SEPARATOR FABRIC FOR ACCESS ROAD ONLY, BORROW PIT DEVELOPMENT, GEOTECHNICAL FOUNDATION INSTRUMENTATION, TURF ESTABLISHMENT, REMOVAL AND REPLACEMENT OF CHAIN LINK FENCING AND CULVERT AND ALL OTHER RELATED INCIDENTAL WORK. ********************************************** 05 AUG 2026 - Corrupted "Plans" file replaced. ********************************************** Amendment 0001: 1. Set a site visit for Wednesday, 19 August 2026 at 10:00 AM, local time. 2. Extend the Q&A period to Friday, 21 August 2026 at 10:00 AM, local time. ********************************************** Amendment 0002: 1. Postpone bid submission to 11 September 2026, 10:00 AM, local time. 2. Postpone the bid opening to 11 September 2026, 11:00 AM, local time. ********************************************** Amendment 0003: 1. Postpone the bid submission to Wednesday, 16 September 2026, 10:00 AM, local time. 2. Postpone the bid opening to Wednesday, 16 September 2026, 11:00 AM, local time. 3. Establish a Q&A period, for inquires in regard to Amendment 0003. 4. Make changes to the specifications and plans as detailed in the following pages. 5. Respond to inquires.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.
Same solicitation, other stages
Related procurement history
Other public MaroNest records that share this exact SAM.gov agency and solicitation number, including presolicitation notices, amendments, and award outcomes. Verify amendment/award relationships on the official SAM.gov notice.
Mississippi River & Tributaries, Morganza to the Gulf, Upper Reach F – Falgout Canal Road to Bayou Grand Caillou Flood Gate Structure – Stage 1 Levee Lift Sta. 2280+28 to Sta. 2130+00, Terrebonne Parish, LouisianaSolicitation · Closed · Posted Sep 18, 2026Due Sep 18Mississippi River & Tributaries, Morganza to the Gulf, Upper Reach F – Falgout Canal Road to Bayou Grand Caillou Flood Gate Structure – Stage 1 Levee Lift Sta. 2280+28 to Sta. 2130+00, Terrebonne Parish, LouisianaSolicitation · Closed · Posted Sep 15, 2026Due Sep 18Mississippi River & Tributaries, Morganza to the Gulf, Upper Reach F – Falgout Canal Road to Bayou Grand Caillou Flood Gate Structure – Stage 1 Levee Lift Sta. 2280+28 to Sta. 2130+00, Terrebonne Parish, LouisianaSolicitation · Closed · Posted Aug 27, 2026Due Sep 11Mississippi River & Tributaries, Morganza to the Gulf, Upper Reach F – Falgout Canal Road to Bayou Grand Caillou Flood Gate Structure – Stage 1 Levee Lift Sta. 2280+28 to Sta. 2130+00, Terrebonne Parish, LouisianaSolicitation · Closed · Posted Aug 10, 2026Due Sep 3