OtherOpen
SCBA Breathing Air Compressor Filling Station (EU Specification) – USAG Ansbach Fire Rescue
DEPT OF DEFENSE › DEPT OF THE ARMY › 0409 AQ HQ CONTRACT
Response deadlineSep 1, 2026 9:00 AM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 1, 2026 9:00 AM EDT
- Posted
- Aug 18, 2026 12:00 AM EDT
- Notice type
- Presolicitation
- Set-aside
- No Set aside used
- NAICS
- 333912
- PSC
- 4210
- Place of performance
- KATTERBACH, Bavaria
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Other
- Notice ID
- 21acd78a3cdb4004a3415b97fc6f8f4d
- Solicitation number
- PAN40926P0000028932
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 19, 2026 8:09 PM EDT.
NOTICE: This pre?solicitation notice is issued for planning and informational purposes only and does not constitute a solicitation or commitment by the Government. All detailed specifications, instructions, and evaluation criteria will be provided in the forthcoming solicitation. DESCRIPTION: The 409th Contracting Support Brigade, Regional Contracting Office (RCO) Bavaria, intends to issue a Request for Quotation (RFQ) for the procurement, delivery, installation, and TÜV inspection/certification of one Self?Contained Breathing Apparatus (SCBA) Breathing Air Compressor Filling Station (EU Specification) for USAG Ansbach Fire Rescue. REQUIRED ITEM: SCBA Breathing Air Compressor Filling Station (EU Spec), including: • Breathing air compressor compliant with DIN EN 1012?1; breathing air quality per DIN EN 12021; 550 l/min delivery rate; 350 bar operating pressure; 4 compression stages; electric motor 15 kW / 50 Hz / 400 V; “Super Silent” enclosure. • Monitoring systems: capacitive filter moisture monitoring (normal/pre?warning/saturated), automatic shutdown/lockout on saturation, oil pressure monitoring, final?stage temperature monitoring, cycle counting, and software?based logbook. • 8?outlet “8S” filling configuration on front and rear panels; automatic condensate drain; external control panel with ON/OFF, emergency stop, and operating hours counter. • 6?way stainless steel wall?mounted filling console (1200 mm width) with 6 × 300 bar filling ports, throttles for CFRP cylinders, safety filling plugs, toggle valves with automatic venting, and 400 bar pressure gauge. • 2?port stainless steel filling bar (750 mm width), 2 × 200 bar filling connections, toggle?lever valves, swivel joints, 1?meter filling hoses with safety nipples, adjustable pressure reducer, TÜV?certified 225 bar safety valve, dual pressure gauges. • On?site TÜV acceptance, cybersecurity inspection, three pre?commissioning inspections of storage cylinders, and all associated travel/mileage. CRITICAL REQUIREMENT – COMPATIBILITY: All filling ports, fittings, hoses, safety filling plugs/nipples, and the compressor system must be 100% compatible and fully interoperable with the customer’s existing Draeger SCBA cylinders, including 300 bar CFRP cylinders, and the current breathing air infrastructure used by USAG Ansbach Fire Rescue. Non?compatible equipment will be determined technically unacceptable.
Contacts
Jean Carlos Silva
Primary
jean.c.silva2.mil@army.milPersonalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.