Bid opportunityClosed
K LOADER PARTS SUPPLY AT AL MINHAD AIRBASE, UNITED ARAB EMIRATES
DEPT OF DEFENSE › DEPT OF THE NAVY › NAVSUP FLC BAHRAIN
Response deadlineSep 29, 2026 1:00 AM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 29, 2026 1:00 AM EDT
- Posted
- Sep 25, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- PSC
- 3990 — Miscellaneous Materials Handling Equipment.
- Place of performance
- Dubai
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Bid opportunity
- Notice ID
- e089e6e095eb4f018b219908b0a49442
- Solicitation number
- N4033926QD007
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 27, 2026 2:11 AM EDT.
STATEMENT OF WORK (K-Loader Repair Parts – Al Minhad AB, U.A.E.) 1. Scope: This requirement is for the procurement and delivery of repair parts required to restore an inoperable K-Loader supporting the CTF-53 Minhad Air Cargo Team at Al Minhad Air Base, U.A.E. 2. Specific Requirements: Contractor shall: 2.1 Provide and deliver the following K-Loader repair parts: Pump, Hydraulic – Part #623-8652 – Qty: 1 Filter, High Pressure, 75 GPM – Part #514-8245 – Qty: 1 FK-E-Pump, Halvorsen – Part #627-9669-050 – Qty: 1 Joystick and Card, Convey – Part #624-2917 – Qty: 1 A-Manifold, Chassis Hydraulic – Part #631-7559-003 – Qty: 1 2.2 All parts shall be new, unused, serviceable, and compatible with the K-Loader for which they are intended. Equivalent or alternate parts are acceptable, provided they meet the exact specifications, form, fit, function, compatibility, and performance requirements of the parts identified in this SOW. Any proposed alternate part shall be fully compatible with the applicable K-Loader and meet or exceed the specifications of the listed JBT/Oshkosh AeroTech part number. For any proposed equivalent or alternate part, the Contractor shall provide sufficient technical documentation to enable Government technical review and verification of compliance with the requirements of this SOW. Documentation shall include, as applicable, the manufacturer/brand, model and part number, technical specifications, product data sheets, compatibility information, and any other supporting documentation necessary to demonstrate that the proposed part meets or exceeds the specifications, form, fit, function, compatibility, and performance requirements of the listed JBT/Oshkosh AeroTech part. 2.3 Shipping and Delivery: Contractor shall provide all packaging, handling, and outbound freight necessary to deliver the required parts to Al Minhad Air Base, U.A.E. Contractor shall provide shipment tracking information and applicable shipping documentation upon shipment. Based on the estimated lead time provided by the Original Equipment Manufacturer (OEM), and allowing additional time for order coordination, documentation, shipment, and final delivery to Al Minhad Air Base, all required parts shall be delivered no later than ninety (90) calendar days after receipt of order (ARO). Based on an anticipated receipt of order date of 30 September 2026, the required delivery date shall be no later than (NLT) 29 December 2026. 2.4 Inspection and Acceptance: The Government-designated receiving representative shall inspect delivered parts to verify correct part numbers, quantities, and condition. Any incorrect, damaged, defective, or otherwise nonconforming parts shall be replaced by the Contractor at no additional cost to the Government. 2.5 Delivery Documentation: Contractor shall provide a delivery receipt or packing list identifying the part description, part number, quantity, and date of delivery. The Government- designated receiving representative shall acknowledge receipt and acceptance of the delivered items. 2.6 Warranty: All parts shall be covered by the manufacturer's standard warranty, where applicable. The Contractor shall provide applicable warranty documentation with the delivered parts. 3. Period of Performance: The period of performance shall begin upon contract award and continue through final delivery and Government acceptance of all required parts. Delivery of all required parts shall occur within ninety (90) calendar days ARO, with an anticipated NLT delivery date of 29 December 2026 based on receipt of order on 30 September 2026.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Review before pursuing
We found a requirement that may limit who can compete. Review the solicitation details before proceeding.
Detected in
- Description“ble, provided they meet the exact specifications, form, fit, function, compatibility, and performance requirements of the parts identified in this SOW. Any proposed alternate part shall be fully compatible with the appli”
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.