Cedar Creek Watershed 16 & 16A Remedial Repair -NRCS Texas
AGRICULTURE, DEPARTMENT OF › FARM PRODUCTION AND CONSERVATION BUSINESS CENTER › FPAC BUS CNTR-ACQ DIV
Response deadlineAug 28, 2026 6:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 28, 2026 6:00 PM EDT
- Posted
- Aug 19, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237990
- PSC
- Y1QA
- Place of performance
- Texas
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Bid opportunity
- Notice ID
- 2414e3810ae4483f95c9337021291c4c
- Solicitation number
- 12FPC326Q0043
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 22, 2026 8:09 PM EDT.
Amendment 1 - The purpose of this amendment is to incorporate the following: Attachment 1: Amend 1 Site Showing Technical Notes Q&A Site Visit sign-in sheet Questions and Answers Site Visit Technical Notes Attachment 2: Amend 1 SF 1442 SF 1442 - Please complete and include with your The quote due date is extended to 5pm Central Time on August 28??. Note: changed from Eastern time to local Central Time to limit confusion. Please review all attached in their entirety. Orginal Solicitation This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12FPC326Q0043 is issued as a Request for Quotation (RFQ) for Cedar Creek Watershed 16 and 16A Remedial Repairs. The upstream wave berm repair for both Sites 16 and 16A will consist of stripping and stockpiling the topsoil from the embankment eroded area; performing excavation and earthfill activities to achieve the specified rock riprap subgrade; placing and anchoring geotextile fabric on the approved subgrade; placing rock riprap to the required thickness and limits as shown in the construction drawings; backfilling the toe of the rock riprap with earthen materials; blending the earthwork above the rock riprap into the existing embankment; establishing vegetation; and removing and reconstructing fence as shown on the construction drawings. The existing plunge basins for both sites have experienced erosion along the side slopes of the basin and outlet channel. To prevent/retard future erosion, the basins will be armored with a blanket of rock riprap. [Site 16A only] Plunge basin erosion has also caused damage to the principal spillway pipe in the vicinity of the pipe outlet. Repair of this damage includes excavating embankment material from around the damaged pipe sections; removing and reconstructing the damaged pipe cantilever, pipe support, and concrete cradle; replacing approximately 40 ft. of the damaged spillway pipe at the outlet; installing a new sand filter collar around a portion of the replaced pipe sections; and reconstructing the earthen embankment in this vicinity. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990, Other Heavy and Civil Engineering Construction. The small business size standard is 45M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The contractor shall furnish all labor, materials, equipment and supervision required to construct the project at outlined in statement of work and detailed in the specifications, drawings, and plans attached hereto. Magnitude of Requirement: Between $1,000,000 and $5,000,000 A site showing will be held on August 6, 2026, at 10:00am ET. Attendees will meet at USDA Service Center, 8620 FM 741, Forney Texas 75126. Questions will not be answered at the site visit. The visit is strictly a walk through, any/all questions shall be submitted in writing to Contract Specialist, Blake Boyer, blake.boyer@usda.gov no later than August 13, 2026, at 4PM Eastern Time. Please include the solicitation name and number as the subject line of the email. Please see the attached document(s) for complete details.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.