OtherClosed
Pre-Solicitation Notice and Notice of intent to award a sole source contract
STATE, DEPARTMENT OF › US EMBASSY LOME
Response deadlineSep 23, 2026 12:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 23, 2026 12:00 PM EDT
- Posted
- Sep 8, 2026 12:00 AM EDT
- Notice type
- Presolicitation
- Set-aside
- No Set aside used
- PSC
- Z1AA — Maintenance Of Office Buildings
- Place of performance
- LOME, Maritime
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Other
- Notice ID
- 96c51b8592964ea8866283eb63018474
- Solicitation number
- 19T04026Q0016
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 9, 2026 10:23 PM EDT.
This is a notice of intent to award a sole source contract. Pursuant to Federal Acquisition Regulations FAR 13.106-1(b)(1)(i). The Embassy of the United States of America in Lome, Togo has a requirement to replace the chiller coils at the Embassy building. The Embassy requires the immediate removal of existing compromised and corroded HVAC chiller coils and the installation of new, direct-fit replacement coils on the facility’s chiller systems. The scope of this project involves the procurement, delivery, and installation of commercial-grade chiller coils to restore the facility's HVAC cooling capacity and efficiency. The Embassy of the United States Lome, Department of State intends to award a firm-fixed-price contract on a sole-source basis to: Johnson Controls Industries – YORK & SABROE Service 14 Rue de Bel Air - 44470 - Carquefou FRANCE Phone number: +33.240.30.63.70 - +33.611.95.75.71 The scope of this acquisition requires from the contractor to provide all labor, supervision, materials, equipment, tools, and transportation necessary to perform the following core tasks: Field verify existing dimensions, configurations, and performance specifications of the current chiller coils. Safely recover and dispose of existing refrigerants in accordance with EPA regulations. Demolish and remove the damaged or degraded cooling coils. Supply and install new, heavy-duty replacement coils matching or exceeding original equipment manufacturer (OEM) performance standards. Reconnect all piping, controls, and electrical components. Perform pressure testing, vacuum pull-down, refrigerant charging, and comprehensive system startup testing to verify proper operation. The anticipated period of performance is three months Place of Performance: US Embassy Lome 4332 blvd Eyadema – Cité OUA BP 852 Lome Togo Statutory Authority This procurement is being conducted in accordance with FAR Part 13, Simplified Acquisition Procedures. This contract action is for supplies and services for which the Government intends to solicit and negotiate with only one source under the authority of: Federal Acquisition Regulation (FAR) 13.106-1(b)(1)(i), "Soliciting from a Single Source" for purchases not exceeding the Simplified Acquisition Threshold. Justification for Single Source Johnson Controls (JCI) is uniquely qualified and is the only known source capable of fulfilling this requirement because the rusted coils are part of an existing JCI / York Air Handling Unit (AHU) or Chiller. Replacing them with third-party, non-OEM (Original Equipment Manufacturer) coils introduces a high risk of improper alignment, sizing mismatches, and compromised structural integrity. The existing air handling infrastructure relies on proprietary dimensions and specific engineering design thresholds unique to Johnson Controls. Utilizing an aftermarket coil would modify the original equipment manufacturer (OEM) configuration, altering the precise static pressure drop, air velocity profiles, and thermal performance parameters engineered by JCI. The vendor possesses proprietary rights, data software, or manufacturing drawings essential to completing the work. Capability Statements and Responses THIS NOTICE IS NOT A REQUEST FOR COMPETITIVE QUOTES; AND NO SOLICITATION IS AVAILABLE. Inquiries will only be accepted via email to the Primary Point of Contact: LomeProcurement@state.gov
Attachments
No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.
Contacts
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
Strong pursuit warning
This notice contains language indicating a sole-source or otherwise restricted procurement. Review the cited evidence before investing time in a response.
Detected in
- Notice title“Pre-Solicitation Notice and Notice of intent to award a sole source contract”
- Description“ing from a Single Source" for purchases not exceeding the Simplified Acquisition Threshold. Justification for Single Source Johnson Controls (JCI) is uniquely qualified and is the only known source capable of fulfilling ”
- Description“pment Manufacturer) coils introduces a high risk of improper alignment, sizing mismatches, and compromised structural integrity. The existing air handling infrastructure relies on proprietary dimensions and specific engi”
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.