Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
ENERGY, DEPARTMENT OF › FERMILAB - DOE CONTRACTOR
Response deadlineNov 17, 2026 5:00 PM EST · 42 days left
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Nov 17, 2026 5:00 PM EST · 42 days left
- Posted
- Sep 17, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- PSC
- Z2EZ — Repair Or Alteration Of Other Industrial Buildings
- Place of performance
- Batavia, Illinois
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Bid opportunity
- Notice ID
- b3e96254b8dc47f48e58f2821e5100ad
- Solicitation number
- RFP-376508-CD
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 18, 2026 10:23 PM EDT.
This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.