Bid opportunityOpen
6973GH-26-Q-00130 - ASR-8 Weather Kits
TRANSPORTATION, DEPARTMENT OF › FEDERAL AVIATION ADMINISTRATION › 6973GH FRANCHISE ACQUISITION SVCS
Response deadlineSep 11, 2026 3:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 11, 2026 3:00 PM EDT
- Posted
- Aug 26, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 334419
- PSC
- 5963
- Place of performance
- Oklahoma City, Oklahoma
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Bid opportunity
- Notice ID
- a0b8e21190eb4bbbbacf6d94373aa504
- Solicitation number
- 6973GH-26-Q-00130-ASR-9_Weather_Kits
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 27, 2026 5:17 PM EDT.
1. BACKGROUND The Federal Aviation Administration (FAA) has identified a requirement to procure conversion kits to support modifications to the Air Traffic Control Beacon Interrogator (ATCBI-5) configuration at Airport Surveillance Radar Model 8 (ASR-8) facilities as part of the Brand-New Air Traffic Control System (BNATCS) implementation under the Radar System Replacement (RSR) Program. The rotary joints currently installed at ASR-8/ATCBI-5 sites do not provide the number of signal paths required to support integration with the RSR architecture. To achieve compatibility, the existing rotary joints must be converted to the configuration utilized at ASR-8 sites equipped with the Mode Select Beacon System (Mode-S). This conversion requires the installation of a kit developed by AJW-1433, which adds an additional signal path to accommodate Weather Signal transmission through the rotary joint. 2. CONTRACTING OFFICER’S REPRESENTATIVE (COR): The COR formally designated this responsibility by the Contracting Officer to provide direction and Government oversight to the contractor on matters related to this contract. The COR is: Brandon Brumley AJW-L910, Radar Technical and Program Support Branch 3. SCOPE OF WORK The contractor must furnish all labor, facilities, equipment, and materials to fabricate a kit as outlined in each section that follows. A. CLIN 001 – One (1) First Article Unit - Shall be delivered NLT 90 days After Receipt of Order B. CLIN 002 – Option to purchase up to thirty-nine (39) Production Units after first article approval 4. REQUIREMENTS 4.1 Design, Construction, and Testing The contractor shall procure and package the parts listed in Attachment 1 – Parts List into a Kit. 4.2 First Article Unit Delivery Contractor must deliver one verification unit. Delivery shall occur no later than (NLT) ninety (90) days at receipt of order (ARO). 4.3 Verification Unit Analysis Upon receipt of first article unit, FAA shall perform visual inspection to determine conformance to Attachment 1 – Parts List. FAA will have 30 days to accept or reject first articles. 4.4 Production Units Once approval is provided for the first article unit, the contractor shall be considered an approved source of production units. The number of units for production is thirty-nine (39). Delivery of production units shall occur NLT 180 days after notification of First Article Approval. 5. PREPARATION FOR DELIVERY 5.1 Preservation, Packaging, and Packing Preservation, packaging, and packing shall be IAW Provision 61.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.