OtherClosing soon
Integrated Industrial Control System Server Purchasing and Installation
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA5205 35 CONS PK
Response deadlineAug 26, 2026 9:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 26, 2026 9:00 PM EDT
- Posted
- Aug 25, 2026 12:00 AM EDT
- Notice type
- Presolicitation
- Set-aside
- No Set aside used
- NAICS
- 513210
- PSC
- 7A21
- Place of performance
- Misawa, Aomori
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Other
- Notice ID
- bbf4774b863848aeb3344ce4934428ed
- Solicitation number
- FA520526QB134
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 26, 2026 5:17 PM EDT.
This is pre-solicitation notice prepared IAW Revolutionary FAR Overhaul (RFO) 5.1 and 12.201(c)(2). THIS NOTICE IS NOT A REQUEST FOR QUOTATIONS. The Government intends to solicit this requirement directly from suppliers IAW RFO 12.201(c)(2) for firm-fixed price contract to purchase Integrated Industrial Control System (IICS) Server, in Misawa Air Base, Japan. Description of Requirement: Perform procurement, delivery, and installation to establish Energy Management and control System (EMCS) Java Application Control Engine (JACE) system, Misawa Air Base, Japan. The items to be purchased include the following: Hardware (Brand Name): - Dell PowerEdge R470 (CPU: Intel Xeon 6 performance 6521P 2.6G, 24C/48T, 144M Cache, Turbo, (225W) DDR5-6400, MEM:32GB RDIMM, 6400MT/s, Dual Rank x8, SSD: 960GB SSD SATA Read Intensive, 6Gbps 512e x5, RAID5, PS: Dual Redundant (1+1), 1500WMM (100-240Vac) Titanium, QTY 1 Unit - 8X DVD-ROM (USB, External), QTY 1 Unit - NAS (TS71210RH1604), QTY 1 Unit - Laptop PC (CPU: Snapdragon X Plus X1P-64-100, MEM: 16GB, SSD: 512GB), QTY: 1 Unit Software (Niagara Components) (Brand Name): - N4 Supervisor 100 Network (S-N4-100), QTY 4 Set - N4 Supervisor SMA Init. 18 months (SUP-100-SMA-INIT), QTY 4 Set Installation and Configuration: Complete installation and configuration of EMCS JACE system to ensure stable system operation and communication with the existing EMCS/JACE system. Note1: This procurement will be performed entirely in the country in Japan, and an offeror must submit their performance record for relevant installation service within 3 years in U.S. Installation in Japan from the date of today.
Contacts
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.