OtherOpen
MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA8903 772 ESS PK
Response deadlineSep 9, 2026 11:00 AM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 9, 2026 11:00 AM EDT
- Posted
- Aug 21, 2026 12:00 AM EDT
- Notice type
- Special Notice
- Set-aside
- No Set aside used
- NAICS
- Not provided by SAM.gov
- PSC
- Not provided by SAM.gov
- Place of performance
- Dyess AFB, Texas
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Other
- Notice ID
- f0e50b48383d44e4b8ed17fab2bef02c
- Solicitation number
- FA8903-26-OT003
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 22, 2026 8:09 PM EDT.
This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a. The 772nd Enterprise Sourcing Squadron (772 ESS) is seeking innovative commercial design and engineering partners to develop a comprehensive, site-specific design package for rapidly deployable Earth-Covered Munitions (ECM) storage facilities at Dyess AFB, Texas. The Government requires rapidly deployable Class V munitions storage facilities to support evolving global threats and warfighter readiness. Traditional MILCON processes and standard ECM build face structural and procedural bottlenecks—ranging from slow curing times to complex bespoke formwork—that prevent rapid deployment. This AOI seeks architectural and engineering innovations that bypass these traditional bottlenecks. The Government is looking for design concepts incorporating advanced formwork, rapid-curing materials, modular structural arches, or other commercial methodologies that accelerate the timeline while fully maintaining all required blast resistance, structural integrity, and environmental controls. There are (2) two lines of effort (LOEs) for this requirement: LOE 1 - Design & Planning (Design) and LOE 2 - Physical Construction. See attachment PDF: MACH1_AOI_FA890326OT003_Muns_Igloos_Dyess_ 21 Aug 26.pdf
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.