Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
OtherOpen

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 690567 WESTERN FEDERAL LANDS DIV

Response deadlineNot provided
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Not provided or not applicable
Posted
Sep 23, 2026 12:00 AM EDT
Notice type
Presolicitation
Set-aside
Not provided or not applicable
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Yellowstone National Park, Wyoming
Current status
Open

Notice details

Official status
Open
Normalized group
Other
Notice ID
ee62a64de8774ef9b10b1f057b0fe8cc
Solicitation number
69056726R000020

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 25, 2026 2:10 AM EDT.

PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 LOCATION: 0.4 miles SW of Mammoth, WY WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details. LENGTH: 0.7 miles and parking lot TENTATIVE COMPLETION DATE: Fall 2028 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 . INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links) This project is anticipated to be solicited Winter 2026/2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.

Attachments

3 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Contracts G. Office
Primary
wfl.contracts@dot.gov
Phone: 3606197520

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.