OtherClosing soon
Ft. Lee Obstacle Course Construction
DEPT OF DEFENSE › DEPT OF THE ARMY › W2SD ENDIST NORFOLK
Response deadlineOct 8, 2026 10:00 AM EDT · 43 hours left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Oct 8, 2026 10:00 AM EDT · 43 hours left
- Posted
- Sep 16, 2026 12:00 AM EDT
- Notice type
- Presolicitation
- Set-aside
- Small Business Set Aside - Total
- PSC
- Y1PZ — Construction Of Other Non-Building Facilities
- Place of performance
- Prince George, Virginia
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Other
- Notice ID
- e5e42bb2cbc6430a9c55ad5296d8c36c
- Solicitation number
- W9123627BA001
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 17, 2026 10:23 PM EDT.
This is a pre-solicitation notice. Neither bids nor proposals are expected from contractors at this time. The actual solicitation is expected to be released approximately during the month of October 2026. The drawing and specification package will be included with the solicitation. Project Description: The purpose of this project is to construct a Confidence Obstacle Course (CFOC) and sheltered bleacher area with lightning protection. The CFOC will consist of twenty-four obstacle stations. Directional and obstacle signage will be provided to guide soldiers through the entire course. A 10ft maneuver trail between obstacles will be provided to support training or emergency vehicle movement through the course, to include the ability to bypass an obstacle on one side. A Tactical Assembly Area (TAA) of roughly half of an acre will be cleared in the center of the course and an entrance trail from TA-27 will be constructed. Gravel and fill dirt will be added to provide drainage away from the course and create a flat surface for all cleared areas. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.
Attachments
No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.
Contacts
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.