Bid opportunityOpen
J--HAULOUT OF THE R/V STURGEON
INTERIOR, DEPARTMENT OF THE › US GEOLOGICAL SURVEY › OFC OF ACQUISITION GRANTS-DENVER
Response deadlineSep 9, 2026 1:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 9, 2026 1:00 PM EDT
- Posted
- Aug 13, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 336611
- PSC
- J019
- Place of performance
- Not specified
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Bid opportunity
- Notice ID
- 54c7b1c5b5f641d884ad9fbca0d01bea
- Solicitation number
- 140G0226R0020
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 15, 2026 8:01 PM EDT.
Amendment 0001 provides responses to questions received and includes Attachment 7 Dimensions of Hydrophones NC 1-08 Shielded 4 Post, Attachment 8 W.W Williams Proposal RV Sturgeon Engine and Gear Refresh and Attachment 9 Centek Marine Quote 20734 1. Drawing 26-105-921 HYDROPHONE INSTALLATION states on GENERAL NOTES states "9. MARPORT HYDROPHONES OUTBOARD MOUNTING ANGLE RESEARVED". Please verify who and when that information will be provided to Contractor. Answer: Marport is the company that makes the science equipment. Two hydrophones spaced approximately 3m apart (+/- 1.5m from centerline) along the stern, both oriented vertically and toed outboard 15 degrees. One, preferably port, tilted down 15 degrees, and the other down 25 degrees. See Attachment 7 Dimensions of Hydrophone NC 1-08 Shielded 4 Post. 2. Please 7.3 Remove Propulsion Shafts and Inspect states "All line shaft bearings and shaft seals shall be replaced when clearances fall outside of the acceptable range." Please verify that the cost associated for any replacement bearings or seals, if necessary, will be part of a Condition Found Report and will be included in a Modification. Answer: Correct. Any conditions identified during the removal and inspection of the bearings and seals will need to be documented by the contractor in a Condition Found Report (CFR) and upon receipt, the Government will review the CFR, and if additional work is approved, the cost will be incorporated into a contract modification prior to the contractor performing the replacement.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.