Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

J--HAULOUT OF THE R/V STURGEON

INTERIOR, DEPARTMENT OF THE › US GEOLOGICAL SURVEY › OFC OF ACQUISITION GRANTS-DENVER

Response deadlineSep 9, 2026 1:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 9, 2026 1:00 PM EDT
Posted
Aug 13, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
336611
PSC
J019
Place of performance
Not specified
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
54c7b1c5b5f641d884ad9fbca0d01bea
Solicitation number
140G0226R0020

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 15, 2026 8:01 PM EDT.

Amendment 0001 provides responses to questions received and includes Attachment 7 Dimensions of Hydrophones NC 1-08 Shielded 4 Post, Attachment 8 W.W Williams Proposal RV Sturgeon Engine and Gear Refresh and Attachment 9 Centek Marine Quote 20734 1. Drawing 26-105-921 HYDROPHONE INSTALLATION states on GENERAL NOTES states "9. MARPORT HYDROPHONES OUTBOARD MOUNTING ANGLE RESEARVED". Please verify who and when that information will be provided to Contractor. Answer: Marport is the company that makes the science equipment. Two hydrophones spaced approximately 3m apart (+/- 1.5m from centerline) along the stern, both oriented vertically and toed outboard 15 degrees. One, preferably port, tilted down 15 degrees, and the other down 25 degrees. See Attachment 7 Dimensions of Hydrophone NC 1-08 Shielded 4 Post. 2. Please 7.3 Remove Propulsion Shafts and Inspect states "All line shaft bearings and shaft seals shall be replaced when clearances fall outside of the acceptable range." Please verify that the cost associated for any replacement bearings or seals, if necessary, will be part of a Condition Found Report and will be included in a Modification. Answer: Correct. Any conditions identified during the removal and inspection of the bearings and seals will need to be documented by the contractor in a Condition Found Report (CFR) and upon receipt, the Government will review the CFR, and if additional work is approved, the cost will be incorporated into a contract modification prior to the contractor performing the replacement.

Attachments

10 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Wilson, Mary
Primary
bwilson@usgs.gov
Phone: 573-397-2277

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.