Bid opportunityClosed
DOCK AND DECK PLATE REPAIR
VETERANS AFFAIRS, DEPARTMENT OF › 246-NETWORK CONTRACTING OFFICE 6 (36C246)
Response deadlineSep 15, 2026 5:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 15, 2026 5:00 PM EDT
- Posted
- Sep 3, 2026 12:00 AM EDT
- Notice type
- Solicitation
- PSC
- Z1DA — Maintenance Of Hospitals And Infirmaries
- Place of performance
- Salem, Virginia
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Bid opportunity
- Notice ID
- 9bc2f062930e407393b0026bb01e2735
- Solicitation number
- 36C24626Q0889
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 5, 2026 10:23 PM EDT.
Department of Veterans Affairs Salem VA Medical Center 1970?Roanoke?Blvd,?Salem,?VA?24153 Statement of Work (SOW) Project Title:?Dock and Dock Plate Replacement – Buildings?14?&?15 Facility:?Salem?VA?Medical?Center (VAMC) Date:?May?14,?2026 1.?Scope?of?Work The contractor shall furnish all labor, materials, equipment, and supervision required to remove and replace existing dock plates and perform associated concrete and structural work at Buildings?14?and?15, Salem?VAMC. All work shall comply with VA standards, local building codes, and OSHA safety requirements. 2.?Description?of?Work Building?14 Remove existing dock plate. Sawcut and remove approximately 14?ft?×?50?ft?of?asphalt. Remove approximately 50?ft?of?existing curb. Excavate for new footing at existing dock wall to extend dock area. Form and pour new 4?ft?×?1?ft?×?14?ft?retaining wall with 4×4?steel angle on edge. Form and pour new 6?in?×?18?in?×?50?ft?curb. Form and pour new concrete drive (14?ft?×?50?ft?×?6?in), sloped to allow trucks to back up level with dock. Extend existing handrail by 2?ft. Install new 4?in?×?10?in?×?14?in?rubber dock bumpers. Building?15 Remove existing pit leveler and associated equipment. Infill existing pit with #57?gravel. Sawcut back of pit at cantilever. Pour new 4?in?concrete slab pinned to existing foundation. Install new 4?in?×?4?in?pit leveler frame and pour concrete perimeter. Install new 6?ft?×?8?ft?hydraulic pit leveler and 4?in?×?10?in?×?14?in?dock bumpers. 3.?Performance?Standards All work shall: Meet VA design and construction standards. Comply with Applicable Sections of the VA Electrical, Structural, and Safety Guidelines. Be executed following OSHA safety practices. Be completed per approved construction drawings and specifications. Ensure new concrete and metal installations are level, aligned, and finished to VA quality standards. 4.?Schedule?and?Coordination Work schedule shall be coordinated with the VA Engineering Service prior to mobilization. Contractor shall provide a minimum 48-hour work notice for any activity affecting operations. Access to work areas shall be limited to authorized personnel only. 5.?Safety?and?Environmental?Requirements The contractor shall maintain a safe work environment at all times. All waste materials shall be removed and disposed of in accordance with EPA and local regulations. Contractor shall ensure dust control and minimal disruption to medical center operations. 6.?Inspection?and?Acceptance All work will be inspected by the VA contracting officer’s representative (COR). Final acceptance will occur after successful inspection and demonstration of functionality of all installed components. Period of Performance is 120 days from issuance of Notice to Proceed (NTP).
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.
Same solicitation, other stages
Related procurement history
Other public MaroNest records that share this exact SAM.gov agency and solicitation number, including presolicitation notices, amendments, and award outcomes. Verify amendment/award relationships on the official SAM.gov notice.