Webbers Falls Excitation System

DEPT OF DEFENSE › DEPT OF THE ARMY › W076 ENDIST TULSA

Response deadlineNot provided
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Not provided or not applicable
Posted
Aug 13, 2026 12:00 AM EDT
Notice type
Presolicitation
Set-aside
Not provided or not applicable
NAICS
237990
PSC
Z2KA
Place of performance
Webbers Falls, Oklahoma
Current status
Open

Notice details

Official status
Open
Normalized group
Other
Notice ID
385c98be005c47aaa6977232e4490668
Solicitation number
W912BV26RA029

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 15, 2026 8:02 PM EDT.

Pre-solicitation Notice For Webbers Falls Excitation System Replacements at Webbers Falls, OK This is a PRE-SOLICITATION NOTICE for the Webbers Falls Excitation System Replacements in Webbers Falls, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers – Tulsa has been tasked to solicit for and award a contract for the Webbers Falls Excitation System Replacements, at Webbers Falls, Oklahoma. The proposed design-build project will be procured as an Unrestricted, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted. Project Description: This project includes the replacement of the excitation systems (including the Potential Transformers) for all units at Webbers Falls Powerhouse. The installation and commissioning of Unit 1 will be dependent on the availability of the unit, which is currently out of service due to issues with the speed gear. The Contractor will be responsible for designing and manufacturing the new excitation system equipment, delivering to the site, removing the existing equipment, installing the new equipment, and commissioning the new system. They will also perform model validation testing and reporting as listed above. The Hydroelectric Design Center (HDC) will provide submittal reviews, factory visit(s) to witness factory testing, and commissioning support to include determining draft settings for the excitation systems. The government will be responsible for landing all new cable (except for the AC cables from the bus tap to the Potential Transformers and the DC cables from the exciter to the brush rigging) to all external locations within the powerhouse, external to the new exciter and Potential Transformer cubicles. The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. The North American Industry Classification System code for this procurement 237990 ( Other Heavy and Civil Engineering Construction) which has a small business size standard of $45M. The Product Service Code is: Z2KA (Repair or Alteration of Dams) Estimated duration of construction of this project is 300 calendar days. Anticipated solicitation issuance date is on or about 31 August 2026, and the estimated proposal due date will be on or about 01 October 2026.

Contacts

Tyler Godwin
Primary
tyler.l.godwin@usace.army.mil
Phone: 9186697281
Shawn Brady
Secondary
shawn.brady@usace.army.mil
Phone: 9186694984

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.