DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
DEPT OF DEFENSE › DEPT OF THE ARMY › W2SN ENDIST JAPAN
Response deadlineJan 25, 2027 12:00 AM EST · 110 days left
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Jan 25, 2027 12:00 AM EST · 110 days left
- Posted
- Sep 25, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- Not provided or not applicable
- PSC
- Y1NA — Construction Of Fuel Supply Facilities
- Place of performance
- Yokota Air Base, Japan
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Bid opportunity
- Notice ID
- 80835a9ae0914837976f0009b5704550
- Solicitation number
- W912HV26RA009
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 26, 2026 2:10 AM EDT.
Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE. Update 14 September 2026: Attached Site Visit Roster. Update 10 September 2026: Attached Pre-Proposal Conference Slides. Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.
Same solicitation, other stages
Related procurement history
Other public MaroNest records that share this exact SAM.gov agency and solicitation number, including presolicitation notices, amendments, and award outcomes. Verify amendment/award relationships on the official SAM.gov notice.