Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

Notice of Opportunity (NOO) U.S. Army Reserve, 88th Readiness Division Energy Savings Performance Contract (ESPC)

DEPT OF DEFENSE › DEFENSE LOGISTICS AGENCY › DLA ENERGY

Response deadlineNov 2, 2026 3:00 PM EST · 27 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Nov 2, 2026 3:00 PM EST · 27 days left
Posted
Oct 1, 2026 12:00 AM EDT
Notice type
Solicitation
Set-aside
Not provided or not applicable
PSC
B540 — Building Technology Studies
Place of performance
Minnesota
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
edeffd0bcfea44389a426aaa7a11efb7
Solicitation number
SP060427R0400

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Oct 3, 2026 2:49 AM EDT.

U.S. Army Reserve, 88th RD has an objective to reduce energy consumption, reduce energy cost, and increase energy resiliency of multiple facilities located in Minnesota and Wisconsin. The 88th RD is seeking to identify additional Energy Conservation Measures (ECMs) that provide measurable energy and cost savings. Potential energy and water saving projects may include but are not limited to: envelope improvements, insulation upgrades, window upgrades, LED upgrades, geothermal heat pumps, lighting, controls, renewable energy generation including photovoltaic solar arrays, retro-commissioning, water conservation measures, heating, ventilation, air conditioning (HVAC) upgrades including boilers, furnaces, split systems, and chillers, battery energy storage systems (BESS), and Hydrogen Fuel Cells and microgrids. Additional ECMs of interest include re-tuning; retro-commissioning and re-commissioning; building automation and control systems; window replacement; minor building-envelope improvements; domestic hot-water system replacement; plug-load analysis and reduction, including refrigerators and freezers; water-leak detection; and other water-efficiency upgrades. The project will evaluate these and other cost-effective opportunities to modernize facilities, improve energy and water resilience, and support the 88th RD long-term energy, water conservation, and resiliency goals (as determined by 88th RD and ARIMD). These efforts align with statutory requirements under 10 U.S.C. § 2911 for energy security and resilience, and 42 U.S.C. § 8287 through the Department of Energy’s (DOE) Fourth-Generation Energy Savings Performance Contract (ESPC) Indefinite Delivery Indefinite Quantity (IDIQ) contract. Responses to this NOO must be received no later than 02 November, 3:00 p.m. (Ft. Belvoir, VA local time). Responses must be completed and submitted to the following email mailbox: DLAEnergy-ESPC@dla.mil

Attachments

2 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Christine Bond-Jawish
Primary
christine.bondjawish@dla.mil
Phone: 5719923170
Keith Himmelberger
Secondary
Keith.Himmelberger@dla.mil
Phone: 5719993964

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.