Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

Consulting Flood Hydrologist Services for the U.S. Federal Energy Regulatory Commission

ENERGY, DEPARTMENT OF › FEDERAL ENERGY REGULATORY COMMISSION › ACQUISITION SERVICES DIVISION

Response deadlineSep 10, 2026 10:00 AM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 10, 2026 10:00 AM EDT
Posted
Aug 19, 2026 12:00 AM EDT
Notice type
Solicitation
Set-aside
Not provided or not applicable
NAICS
541620
PSC
B510
Place of performance
Washington, District of Columbia
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
6b79b7238efd484c9dfbda2e0b4d2719
Solicitation number
89603026Q0062

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 20, 2026 8:09 PM EDT.

The agency seeks flood hydrologist consulting services for the purpose of performing in-depth reviewing/performing: • Watershed hydrologic modeling and associated uncertainties; • Probabilistic methods in estimating hydrologic hazard curves, including stochastic event flood modeling methods; • Site Specific, Statewide/Regional and Hydrometeorological Reports (HMRs) based Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) analyses; • Regional frequency analysis to derive Annual Exceedance Probability (AEP) of the precipitation and flood; • Climate change impact analyses on extreme precipitation using Shared Socioeconomic Pathways (SSP) data and/or NASA Earth Exchange Global Daily Downscaled Projections; and • Other flood hydrology-related analyses for dam safety. Typical work efforts associated with the effort include but are not limited to: • Review of submitted analyses, including digital files, prepared by Licensees or their consultants. • Review of published data or reports from federal, state and local sources. • Attendance at Board of Consultants meetings and project meetings. • Provide expert advice to FERC staff on complex flood hydrology issues. • Review proposed scopes of work developed by Licensees or their consultants for consistency with the FERC guidelines and state-of-the-practice procedures. • Preparation of written reports as directed, with critiques, conclusions and recommendations. • Review and comment on correspondence or other communications to Licensees prepared by FERC staff. • Develop technical whitepapers to assist dam safety staff in reviewing/resolving complex technical topics • Provide technical topic training to FERC staff

Attachments

11 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Carol Mays
Primary
carol.mays@ferc.gov
Phone: (202) 502-6184
Kimberly Lewis
Secondary
kimberly.lewis@ferc.gov
Phone: (202) 502-8588

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.