Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

Fort Lee Vehicle Recovery Range

DEPT OF DEFENSE › DEPT OF THE ARMY › W2SD ENDIST NORFOLK

Response deadlineSep 29, 2026 2:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 29, 2026 2:00 PM EDT
Posted
Aug 25, 2026 12:00 AM EDT
Notice type
Solicitation
Set-aside
8(a) Set-Aside (FAR 19.8)
NAICS
236220
PSC
Y1PZ
Place of performance
Fort Lee, Virginia
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
f46186008fd74b78a4b34dda5272802e
Solicitation number
W9123626BA006

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 26, 2026 5:17 PM EDT.

Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.

Attachments

3 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Michael Stevenson
Primary
michael.l.stevenson@usace.army.mil
Phone: (757) 201-7233
Michael Hagerty
Secondary
michael.hagerty@usace.army.mil
Phone: (757) 201-7303

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.