Bid opportunityOpen
Fort Lee Vehicle Recovery Range
DEPT OF DEFENSE › DEPT OF THE ARMY › W2SD ENDIST NORFOLK
Response deadlineSep 29, 2026 2:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 29, 2026 2:00 PM EDT
- Posted
- Aug 25, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- 8(a) Set-Aside (FAR 19.8)
- NAICS
- 236220
- PSC
- Y1PZ
- Place of performance
- Fort Lee, Virginia
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Bid opportunity
- Notice ID
- f46186008fd74b78a4b34dda5272802e
- Solicitation number
- W9123626BA006
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 26, 2026 5:17 PM EDT.
Amendment 0005: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0005. This amendment incoporates the correct solicitaion documents dated May 26, 2026 to replace the previous inadvertently issued solicitation documets dated November 2025. This amendment also reopens ProjNet and extends the bid due date and bid opening date. Please see the amendment for the complete summary of change. The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.