Bid opportunityClosing soon
Thermal Arc Sound Attenuation Booth
DEPT OF DEFENSE › DEPT OF THE ARMY › W6QM MICC-FT DRUM
Response deadlineOct 13, 2026 1:00 PM EDT · 6 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Oct 13, 2026 1:00 PM EDT · 6 days left
- Posted
- Oct 2, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- PSC
- 5410 — Prefabricated and Portable Buildings
- Place of performance
- McAlester Army Ammunition Plant; 1 C Tree Rd Building 6; McAlester, OK 74501, 74501
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Bid opportunity
- Notice ID
- 7cd63ab28d81478da9657df7686d6e35
- Solicitation number
- W911S227U0010
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Oct 5, 2026 12:11 AM EDT.
Thermal Arc Booth Salient Characteristics MCAAP Engineering will verify and validate the proposal from the vendor prior to award.Scope: Thermal Arc Sound Attenuation Booth. Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.Item/Model #: QT100118128TA or similar. 1 EAProduct Description:77.5-inch x 102.5-inch x 116-inch Booth.Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.18ga galvanized flat panel construction with single slope style roof. Rockwool insulation enclosed in between the 3-inch-deep exterior wall panel and the galvanized, perforated interior liner. Unit is to be assembled and shipped with doors loose. Door hardware and switches included.All onsite installation, mounting, etc. are by others. All auxiliary components (exhaust fan, lights, switches, etc.) are supplied and installed by others.Model: Qualitech thermal arc sound attenuation booth model QT77102116TA or similar. 1 EA.Product Description:100-inch x 118.5-inch x 128-inch Booth.Includes all necessary parts and hardware for a completely erected (in 2 halves) Thermal Arc Booth.18ga galvanized flat panel construction with single slope style roof. Rockwool insulation enclosed in between the 3-inch-deep exterior wall panel and the galvanized, perforated interior liner. Unit is to be assembled and shipped with doors loose. All onsite installation, mounting, etc. are by others. All auxiliary components (exhaust fan, lights, switches, etc.) are supplied and installed by others.Thermal Arc Booth Dimensional specs:102.5-inch overall outer dimension entrance to exit face.86.5-inch overall outer dimension of booth depth.36.5-inch outer dimension of front booth section depth.20-inch outer dimension of back booth section depth including the welding arm offset.44-inch outer dimension wide by 9-inch outer dimension deep welding arm offset centered on the back booth section with a 114-inch tall and 26-inches wide cut out.30-inch door gap between the front and back booth sections.10-inch gap on the top between the front and back booth sections for monorail fed items.120-inch minimum interior height.3-inch-deep exterior wall panels.18-inch x 18-inch hole for duct transition piece located on the front booth section above the internal plenum.Features: Internally mounted entrance door that swings towards the front.Externally mounted exit door that swings towards the front.Door hardware and switches including cylinders and controls.Internal plenum in the front booth section for ventilation.Welding arms offset and cut out.18ga galvanized flat panel construction with single slope style roof.Rockwool insulation.Galvanized perforated interior liner.Mounting plates for floor anchoring.Anchoring hardware. Internal bracing.MCAAP to provide: Building air. Installation. Auxiliary components.DETAILED DESCRIPTION REQUIRED PRIOR TO AWARD: The MCAAP Engineering Support Division will validate and verify/approve the contractor listed equipment concept before award is granted. In order to meet this review requirement, the offeror shall submit with their proposal a detailed technical description of the thermal arc booth. The offeror???????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????s description submittal shall account for each one of the required product features located in this qualifying statement. Conceptual drawings that are not detail ???????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????as built??????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????? drawings are required for submittal with the detailed description.Approval drawing(s) is/are requested. 3D models requested can be in native SolidWorks format, IGES, and/or STEP within two weeks after award.
Attachments
No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.
Contacts
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.