Bid opportunityClosed
Benchtop Jacketed Laboratory Reactor System
ENERGY, DEPARTMENT OF › ARGONNE NATL LAB - DOE CONTRACTOR
Response deadlineSep 11, 2026 4:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 11, 2026 4:00 PM EDT
- Posted
- Sep 8, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- Not provided or not applicable
- PSC
- 6640 — Laboratory Equipment and Supplies
- Place of performance
- Lemont, Illinois
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Bid opportunity
- Notice ID
- 44a14a8ac94f4e728690a210711c3256
- Solicitation number
- 6-B185-Q-00433-00
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 9, 2026 10:23 PM EDT.
*THIS RFQ WILL BE EVALUATED BASED ON LOWEST PRICE, TECHNICALLY ACCEPTABLE METHODOLOGY* Looking to source the same or similar benchtop jacketed laboratory reactor system with the following requirements: Line Item 1: Reactor?Ready Mini Starter Minimum Technical Requirements: Modular benchtop reactor platform compatible with Reactor?Ready Mini vessels Must support semi?automated control through integration with digital controllers (e.g., AVA Pad) Chemical?resistant construction suitable for laboratory use Must allow rapid vessel exchange and secure stirring assembly Line Item 2: 250 mL Single Jacketed Mini Vessel Kit Minimum Technical Requirements: 250 mL vessel capacity with single jacket for precise thermal control Compatible with Reactor?Ready Mini system Must support automated or semi?automated heating/cooling via external circulator Borosilicate or chemically resistant glass/jacket materials Line Item 3: RS20 Control Mini Overhead Stirrer (US Plug) Minimum Technical Requirements: Electronic overhead stirrer suitable for mini?scale reactors Must provide digital speed control for semi?automated operation US?compatible electrical plug Capable of handling viscosities typical for research?grade reactions Line Item 4: AVA Pad Reactor Controller (US Plug) Minimum Technical Requirements: Integrated reactor control system enabling semi?automated operation of stirring, temperature, and process steps Touchpad interface for programming reaction parameters Must support automation of reaction profiles and data logging US?compatible electrical plug Line Item 5: M16x1 Insulated Hose, 150 cm Minimum Technical Requirements: Hose length of 150 cm minimum for connection between vessel jacket and circulator M16x1 connector type Insulated to maintain thermal efficiency during semi?automated temperature control Minimum 2 units required Line Item 6: M16 PEEK Vessel Side Arm Connectors Minimum Technical Requirements: Connector constructed from PEEK material for high chemical resistance Must fit M16 side?arm ports on Reactor?Ready vessels Supports automated fluid transfer and jacket circulation Line Item 7: CC?K6 with Pilot One, 4.5 L, 110–120 V Minimum Technical Requirements: Heating/cooling circulator with 4.5 L capacity and 110–120 V power compatibility Must integrate with Reactor?Ready Mini vessels for automated or semi?automated temperature control Pilot One controller interface with programmable temperature profiles Stable, precise temperature regulation suitable for research?grade reactions Line Item 8: E?Grade Professional Minimum Technical Requirements: Software or accessory enabling enhanced automation and process control features Must support semi?automated workflows Provides professional?grade user interface and data functionality Line Item 9: Connection Cable Minimum Technical Requirements: Supports integrated/semi?automated operation of controller and reactor components Durable insulation and lab?safe materials Line Item 10: Condenser Jacket Coil – Rodaviss B19 + GL14 + Fittings Minimum Technical Requirements: Jacketed condenser coil compatible with Reactor?Ready Mini system vessels Rodaviss B19 joint, GL14 fittings included Must support semi?automated condensation and thermal control when paired with circulator Chemical?resistant materials suitable for research?grade reactions Please review all applicable documentation and provide a proposal response no later than 3:00 PM CST September 11, 2026. Within your proposal, please include a fully executed copy of the ANL-70 Request for Quotation, the ANL-70A Reps & Certs, and the country of origin. Any questions can be directed to the Contracting Officer. Thank you in advance for your participation.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.