OtherClosed
TX FW LGA 10(5) Steve Thompson Wildlife Drive
TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI
Response deadlineSep 17, 2026 4:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 17, 2026 4:00 PM EDT
- Posted
- Sep 1, 2026 12:00 AM EDT
- Notice type
- Presolicitation
- Set-aside
- Small Business Set Aside - Total
- PSC
- Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
- Place of performance
- Los Fresnos, Texas
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Other
- Notice ID
- 59b8e11f822345fe8c0b03b9292dcab7
- Solicitation number
- 6982AF26B000014
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 3, 2026 10:24 PM EDT.
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE PROJECT NUMBER: TX FW LGA 10(5) PROJECT NAME: STEVE THOMPSON WILDLIFE DRIVE PROJECT DESCRIPTION: The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps. The project includes three alternate bid items for Aggregate Surface Course (TON) with one being awarded. Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive. Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. PRINCIPAL WORK ITEMS: The project includes the following work items: Full Depth Reclamation (MILE) – 13 MILE Aggregate Surface Course (TON) – 11,000 TON ANTICIPATED SCHEDULE: The anticipated advertisement date is September 2026 with construction beginning in January 2027, and project completion in August 2027. ORDER OF MAGNITUDE: The proposed project cost ranges between $2,000,000 and $5,000,000.
Attachments
No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.
Contacts
Douglas Whitcomb
Primary
cflacquisitions@dot.govJorey Deml
Secondary
cflacquisitions@dot.govPersonalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.