Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityClosed

Floor replacement at 3 main access control areas of the US Embassy in Lima, Peru

STATE, DEPARTMENT OF › USEMBASSY LIMA

Response deadlineSep 22, 2026 11:00 AM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 22, 2026 11:00 AM EDT
Posted
Sep 14, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
Set-aside
No Set aside used
PSC
C1AA — Architect And Engineering- Construction: Office Buildings
Place of performance
lima, Lima
Current status
Closed

Notice details

Official status
Closed
Normalized group
Bid opportunity
Notice ID
6158036985d747ee834615f5a6a9dbef
Solicitation number
19PE5026Q0065

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 16, 2026 10:23 PM EDT.

The U.S. EMBASSY - LIMA requires a vendor to execute a comprehensive, contractor procured floor and interior wall partition overhaul within three main Consular Access Centers / Entry Control Points (CAC-1, CAC-2, and CAC-3) at the Embassy of the United States of America in Lima, Peru. While the CACs are non-classified environments, they represent highly sensitive, primary access control points to the Embassy compound that experience constant, high volume pedestrian traffic. The existing 15 year old porcelain tile flooring is structurally compromised, exhibiting extensive cracks, dents, and surface damage that present safety, operational, and aesthetic concerns at these critical entry checkpoints. This contract requires a qualified and vetted contractor to provide all necessary labor, tools, heavy equipment, transit logistics, and raw materials required to execute the project completely. This includes the demolition of the existing porcelain tiles, concrete subfloor grinding, structural leveling, and the sourcing and professional installation of high traffic finished products. All materials supplied by the contractor must meet or exceed the nonproprietary technical engineering metrics, acoustic thresholds, slip resistance ratings, and architectural parameters defined herein.

Attachments

1 attachment reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Carmen Rutiaga
Primary
rutiagacj@state.gov
Phone: 5116182154
Patrick McElroy
Secondary
mcelroyph@state.gov
Phone: 5116182625

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.