37250PR260000051 - USCG SECTOR SAN DIEGO UNACCOMPANIED HOUSING RECREATION ROOM RENOVATIONS - CONSTRUCTION

HOMELAND SECURITY, DEPARTMENT OF › US COAST GUARD › BASE LOS ANGELES/LONG BEACH(00037)

Response deadlineSep 17, 2026 11:59 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 17, 2026 11:59 PM EDT
Posted
Sep 3, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
PSC
Z2FC — Repair Or Alteration Of Troop Housing Facilities
Place of performance
San Diego, California
Current status
Closed

Notice details

Official status
Closed
Normalized group
Bid opportunity
Notice ID
95a389e90cf04313b174e732a3018ea0
Solicitation number
37250PR260000051

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 5, 2026 10:23 PM EDT.

Solicitation: Tracy Hall UPH Rec Room Renovations Set-Aside: Total Small Business Set-Aside (FAR Subpart 19.5) Location: USCG Sector San Diego, Building C (Tracy Hall), 2170 N. Harbor Drive, San Diego, CA 92101 Important Dates Questions Due: September 14, 2026 Proposals Due: September 17, 2026, by 11:59 PM Eastern Time 1. Project Background and Objective The U.S. Coast Guard requires the renovation of the Tracy Hall (Building C) Unaccompanied Personnel Housing (UPH) Recreation Room. The objective of this contract is to renovate the kitchen, janitorial closet, and bathroom to a professional, standard commercial-grade finish utilizing cost-effective prefabricated fixtures to improve the quality of life, comfort, and utility of the space for active-duty personnel. 2. Scope of Work (Summary) - Please review the attached Statement of Work (SOW) for full technical requirements and applicable codes. The Contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to complete the following renovation tasks (approx. 1,066 SQFT) using standard, commercial-grade prefabricated materials: Kitchen: Demolition of existing cabinets/island, installation of high-durability wood kitchen cabinets, solid surface/granite/butcher block countertops, commercial-grade undercounter ice machine, prefabricated commercial kitchen island, exhaust fan, lockable storage cubbies, and GFI electrical upgrades. Reinstall existing appliances. Janitorial Closet: Supply and install adjustable wire shelving and a localized plumbing clean-out line. Bathroom: Demolish moisture-damaged drywall and existing vanity. Install mold-resistant greenboard, tape, paint, and a new standard all-in-one prefabricated 36-inch wood vanity with integrated sink and plumbing trim. 3. Site Conditions & Hazardous Materials An Asbestos and Lead Survey was conducted for this facility (AESS Job No. 26-092). Asbestos: Chrysotile asbestos was detected at 2% within the texture/taping mud/drywall system on the Building C Main Rec Room ceiling. Lead: No lead was detected above laboratory reporting limits. NO DISTURBANCE ALLOWED: The Contractor is strictly prohibited from disturbing, drilling, cutting, sanding, or impacting the ceiling drywall system. No asbestos abatement is authorized under this contract. 4. Period of Performance All work shall be completed within 60 calendar days from the issuance of the written Notice to Proceed (NTP). Work hours are Monday through Friday, 0730 to 1600 hours, excluding federal holidays. 5. Wage Determinations This project is subject to the Davis-Bacon Act (FAR 52.222-6). Prevailing wages for San Diego County, CA, apply. See the attached General Decision Number: CA20260001, dated 05/18/2026. 6. Proposal Submission Requirements To be considered for award, interested offerors must submit the following documents with their proposal: Product Data Sheets & Warranties: For cabinetry, ice machine, prefabricated island, exhaust fan, bathroom vanity, dumpster costs, etc. Samples: Paint color and cabinet finish samples or spec sheets. Safety Plans: An Activity Hazard Analysis (AHA) & Accident Prevention Plan (APP) explicitly detailing how the crew will avoid disturbing the ACM ceiling. Technical Plan: Detailed technical plan from post-award walk-through to construction completion. Past Performance & Licensing: Relevant past performance examples and valid licensing. Pricing: Transparent pricing breaking down labor and materials along with the total cost. Attachments Statement of Work (SOW) - Tracy Hall UPH Rec Room Renovations Davis-Bacon Wage Determination - CA20260001 (San Diego, CA) Asbestos and Lead Survey Report - AESS Job No. 26-092 All questions should be directed to the Contracting Officer prior to the Q&A deadline.

Attachments

3 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Ryan H. King
Primary
ryan.h.king2@uscg.mil
Phone: 6199435942

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.