Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

Gifford Pinchot National Forest - Fire Trailer Tank Assembly

AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA-FS, CSA NORTHWEST 2

Response deadlineSep 8, 2026 2:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 8, 2026 2:00 PM EDT
Posted
Aug 26, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
336212
PSC
4210
Place of performance
Carson, Washington
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
cbd878040bc94d5a8c3b94c8558181ea
Solicitation number
1240BD26Q0087

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 27, 2026 5:17 PM EDT.

This is a combined synopsis/solicitation for a commercial product prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12 and RFO Subpart 5.2. This announcement constitutes the only solicitation; quotes are being requested.This requirement incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2026-01. Requirement Description The U.S. Forest Service, Gifford Pinchot National Forest, Wind River Ranger District, requires the procurement of a brand new, commercial-grade Fire Trailer Tank and Pump Assembly. Critical Procurement Constraint: The Government currently owns the tandem-axle utility trailer (5’x10’, 7,000 lbs GVWR). This requirement is strictly for the fully integrated skid unit that bolts onto the existing frame. Exclusions: This acquisition explicitly does not include the purchase of a new trailer chassis, wheels, axles, tongue, or towing coupler. Technical Specifications & Salient Characteristics The skid unit must conform to the following core baselines: Tank Structure: Minimum 500-gallon capacity; heavy-duty 10-gauge carbon steel. Internal anti-surge baffles and interior epoxy coating required. Footprint & Weight: Maximum 5’x10’ footprint matching the structural channel layout of the government owned trailer. Total assembly dry weight must not exceed 2,300 lbs. Pump Assembly: 13 HP commercial gas engine paired with a twin-impeller portable centrifugal pump delivering ? 120 GPM @ 40 PSI and ? 20 GPM @ 146 PSI. Drafting & Plumbing: Integrated 2-inch manifold with self-loading/drafting system. Includes 2" x 20' suction hose with foot valve/strainer and a manual hand primer pump. Discharges: 2-inch quarter-turn ball valve main discharge. Valved auxiliary ports in 1-inch, 1.5-inch, and 3/4-inch configurations. Accessories: Manual-wind hose reel loaded with 250 feet of 1-inch utility hose and adjustable nozzle. Integrated lockable rear toolbox, shackle tie-down points, and integrated fenders/mud flaps matching tandem-axle placement. Aesthetics: Tank may be painted red but must not feature any fire use decals or markings. ******See Attached Solictation for Salient Characterisitcs******** Place of Performance/ Timelines Delivery/Production Timeline: Full manufacturing, plumbing, leak pressure testing, and final inspection availability must occur within thirty (30) calendar days from receipt of order (ARO). FOB Delivery Address: Wind River Work Center, 1262 Hemlock Road, Carson, WA 98610. Government Pickup Option: If the contractor’s manufacturing facility sits within a 100-mile driving radius of Carson, WA (98610), the Government reserves the right to execute a local pickup. Evaluation Framework & Basis for Award Award will be made to the responsible offeror representing the most advantageous solution to the Government under the simplified procedures of FAR 12.203. The following factors will be evaluated: Technical Acceptability: Exact matching of technical baselines or validated technical justifications for proposed "or equal" elements. Delivery Timeline: Confirmed ability to meet the mandatory 30-day target. Price: Fair and reasonable evaluation. Submission Protocol Quoters must maintain an Active SAM.gov Registration. Offers omitting a Unique Entity ID (UEI) will be immediately excluded from evaluation. Prices must remain firm for 90 calendar days from the submission deadline. Required Package Components: Completed and signed SF-1449 (Blocks 17a, 30a, 30b, and 30c). Phone, Email, and SAM UEI within Block 17a. Completed unit costs and totals within the Schedule of Items. Completed Requirements Compliance Checklist (attached to Solicitation). Technical drawings, dimensional prints, or commercial component brochures. Signed copies of all issued SF-30 Amendments. See attached solicitation for details, images and all required forms.

Attachments

1 attachment reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Mindy Hickman
Primary
mindy.hickman@usda.gov

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.