Bid opportunityOpen

Design-Build Services – STM Security Fencing - North Boundary

ENERGY, DEPARTMENT OF › ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTOR

Response deadlineNov 11, 2026 7:00 PM EST · 25 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Nov 11, 2026 7:00 PM EST · 25 days left
Posted
Oct 7, 2026 12:00 AM EDT
Notice type
Solicitation
PSC
5660 — Fencing, Fences, Gates and Components
Place of performance
Golden, Colorado
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
2fa822e893384a93bccb65cb8ac7aea4
Solicitation number
RFP-2027-27107

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Oct 9, 2026 12:11 AM EDT.

This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement. Project Overview The National Laboratory of the Rockies (NLR) is soliciting design?build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain?link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations. Design?Build Requirements The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued?for?Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design?to?cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals. Construction Requirements All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off?site disposal activities must be performed in accordance with the SOW and associated exhibits. Management, Coordination, and Quality Assurance The Subcontractor shall provide qualified project management and on?site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as?built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.

Attachments

2 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Stephen Cummock
Primary
steve.cummock@nlr.gov
Phone: 9702170997
Construction Inbox
Secondary
Construction@nlr.gov

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.