Bid opportunityClosing soon
F--OR -Bear Valley NWR -FUEL REDUCTION
INTERIOR, DEPARTMENT OF THE › US FISH AND WILDLIFE SERVICE › FWS, OVER SAT G/S
Response deadlineAug 21, 2026 1:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 21, 2026 1:00 PM EDT
- Posted
- Aug 19, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238910
- PSC
- F099
- Place of performance
- Not specified
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Bid opportunity
- Notice ID
- 01e0d0e34393468295f3b19f3e4654cb
- Solicitation number
- 140F0S26Q0054
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 20, 2026 8:09 PM EDT.
Bear Valley NWR, OR - Fuels Reduction. Work is Hand Thinning/Piling Mixed-Conifer, Hand Thinning/Piling Mixed-Conifer and Brush, Juniper Seedling/Sapling Lop and Scatter, and Juniper Removal. See SOW attached. Vendor will submit a statement that the vendor understands the work and understands the environment and condition the work will be performed in and fill out the quote sheet on the first page of the attachment. Send packets and questions to Robert_Sung@ios.doi.gov with "140F0S26Q0054 - Bear Valley" in the subject line RFI Items: Q1. Could the Government provide the specific calendar dates and restriction details for the wildlife Limited Operating Periods (LOPs) applicable to the Bear Valley NWR project area? A1. For areas within ˝ mile of an active bald eagle nest, treatment will occur outside the nesting season of January 1 ż August 15. For areas designated as calving and fawning for mule deer and elk, treatment will not occur between May 15 ż July 15. Q2. The SOW requires hand thinning, piling, and covering piles with polyethylene material. Can the Government confirm that the contractor's responsibility ends once the piles are constructed and covered, and that the Government (USFWS) will perform the actual burning/disposal of the piles? A2. The contractorżs responsibility ends once the piles are constructed and covered. The Government will be responsible for ensuring the piles are burned. Q3. How are the boundaries for the treatment units (CLINs 0001-0007) currently marked on the ground? Additionally, will the Government provide GIS shapefiles (.shp or .kml) of the project units to the awardee? A3. Treatment areas are not marked on the ground. The Government will supply a geo-referenced maps to the contractor. Q4. Under Industrial Fire Precaution Levels (IFPL) requirements, contractors must often maintain fire-fighting equipment and water on-site. Is there a designated water source available to the contractor within the Bear Valley NWR, or must the contractor haul all water from off-site locations? A4. The contractor will have to haul water from an off-site location.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.