Market researchClosing soon
FA2204_RFI_TACMOR_System
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA2204 THTR BTTL CNTRL AFLCMC/HBD
Response deadlineOct 23, 2026 4:00 PM EDT · 6 days left
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Oct 23, 2026 4:00 PM EDT · 6 days left
- Posted
- Oct 13, 2026 12:00 AM EDT
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- PSC
- 5840 — Radar Equipment, Except Airborne
- Place of performance
- ARMED FORCES - PACIFIC
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Market research
- Notice ID
- c40b998c87e64462912644eaed18551d
- Solicitation number
- FA2204_RFI_TACMOR_System
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Oct 15, 2026 12:12 AM EDT.
The Air Force Life Cycle Management Center, Strategic Sensors Branch (AFLCMC/ESGS) is conducting market research to identify qualified systems integrators capable of designing, developing, producing, installing, operating, and sustaining the full lifecycle of the Tactical Multi-Mission Over-the-Horizon Radar (TACMOR) system. TACMOR is a Middle Tier of Acquisition (MTA) Rapid Prototyping initiative intended to field an operational, remotely operated Over-the-Horizon Radar (OTHR) capability within the Indo-Pacific region. The system will deliver wide-area air domain awareness and support supplementary operational missions across the United States Indo-Pacific Command (USINDOPACOM) Area of Responsibility (AOR). The anticipated contract award is slated for FY2027, with an estimated period of performance extending through FY2029. The TACMOR baseline system architecture requires a bistatic operational profile featuring geographically separated transmit (Tx) and receive (Rx) installations deployed in austere operational environments within the designated operational area. The system will operate as a one-dimensional, remotely operated OTHR integrating permanent antenna field installations with modular, containerized mission support facilities. Comprehensive integrator solutions must address primary and backup self-sustained onsite power generation and fuel storage, physical and electronic security, remote health and status monitoring, secure backhaul communications, environmental resilience against tropical and saltwater conditions, and integration with a centralized Radar Operations Control Center (ROCC). The Government will furnish land, Military Construction (MILCON), and the prepared receive and transmit sites. The Government may also provide black transport communications via fiber optic networks with satellite communications (SATCOM) backup; complete cryptographic and backhaul transport parameters are detailed in the CUI technical data package. Respondents must demonstrate mature technical approaches, industrial base capacity, software engineering maturity, and specialized workforce availability to achieve full integration and system sell-off by 30 September 2029.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.
Same solicitation, other stages
Related procurement history
Other public MaroNest records that share this exact SAM.gov agency and solicitation number, including presolicitation notices, amendments, and award outcomes. Verify amendment/award relationships on the official SAM.gov notice.