Market researchClosing soon
Cooling Tower, Roofing, and Structural Construction
TREASURY, DEPARTMENT OF THE › BUREAU OF ENGRAVING AND PRINTING › OFFICE OF THE CHIEF PROCUREMENT OFFICER
Response deadlineAug 20, 2026 2:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 20, 2026 2:00 PM EDT
- Posted
- Aug 14, 2026 12:00 AM EDT
- Notice type
- Sources Sought
- Set-aside
- Not provided or not applicable
- NAICS
- 236220
- PSC
- Z2EC
- Place of performance
- District of Columbia
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Market research
- Notice ID
- a2635bb60687495ca795ac10b366e793
- Solicitation number
- 2031ZA26B00011
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 15, 2026 8:02 PM EDT.
Seeking Sources ONLY for a design build project. Demolition and replacement of two existing Evapco cooling towers (Model: AT 424-936), replacement of one BAC cooling tower (model number is VXT-800CR from Baltimore air coil company, Serial number is 84-5979) associated structural steel platform, roofing replacement, associated structural components, associated mechanical components, associated electrical components, pump, motors, piping, chemical feed, fire/smoke detector system, condenser water motor/pumps, electrical circuit breaker, piping insulation, SCADA integration, and associated control systems. Contractor should ensure that the project adheres to all guidelines and code, including but not limited to, the International Plumbing Code (IPC), the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) standard and guideline, the American Society of Mechanical Engineers (ASME) codes and standards and the National Electrical Code, etc. The contractor shall provide As-built drawings and updated schematics for this project. The contractor shall provide an integration and SCADA commissioning, demolition, and disposal report. The contractor should provide equipment, structural, and all necessary submittals and cut sheets for all replacement components. The work shall be performed by a qualified HVAC/mechanical contractor with demonstrated experience in large-scale condenser water system installations, including the integration of cooling towers with SCADA systems. The As-built drawing needs to be accepted before the start of construction. Please provide responses of interest to Laqulla.Williams@bep.gov. Include business size, socio-economic category (if applicable) and UEI.
Contacts
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.