Design and Construction of a Modernized Industrial Wastewater Treatment Facility (Bioplant) at Radford Army Ammunition Plant (RFAAP)

DEPT OF DEFENSE › DEPT OF THE ARMY › W6QK ACC-RI

Response deadlineAug 28, 2026 1:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Aug 28, 2026 1:00 PM EDT
Posted
Aug 18, 2026 12:00 AM EDT
Notice type
Presolicitation
Set-aside
No Set aside used
NAICS
325920
PSC
M1EA
Place of performance
Radford, Virginia
Current status
Open

Notice details

Official status
Open
Normalized group
Other
Notice ID
54b92fa570db4fdea97e0d89d5ab36ff
Solicitation number
W519TC-26-R-BIOR

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 19, 2026 8:09 PM EDT.

Constructed in the 1940s, Radford Army Ammunition Plant (RFAAP) is a critical national security asset, serving as the last remaining CONUS Government-owned facility capable of manufacturing nitrocellulose (NC), nitroglycerin (NG), single-base, multi-base, and solventless propellants. The industrial wastewater generated by these manufacturing processes contains complex chemical components—including solvents and propellant residues (solid, dissolved, or suspended energetic materials)—which must be rigorously treated prior to discharge into the New River. The legacy RFAAP Bioplant, constructed in the 1980s, is significantly past its useful service life and acts as a single point of failure for plant operations. Crucially, the facility is located within the 100-year floodplain, exposing it to severe operational risks, as demonstrated by an emergency shutdown during Hurricane Helene in 2024. Due to these critical vulnerabilities, project funding has been accelerated to FY26. Furthermore, the aging facility is increasingly incapable of consistently treating the plant's evolving wastewater streams. RFAAP discharge is strictly regulated by the Virginia Department of Environmental Quality (VDEQ) via a Virginia Pollutant Discharge Elimination System (VPDES) permit under the Clean Water Act. Recently, the legacy plant has suffered a high rate of compliance failure, registering 14 permit violations across three separate incidents within a 16-month period. These violations primarily resulted from an inability to adequately process Biochemical Oxygen Demand (BOD), Chemical The overarching goal is for the offeror(s) to develop design and construction of a wastewater treatment process and deliver a completed solution to the Government. Follow-On Contracts or Transactions (Phase II): In accordance with the authority of 10 U.S.C. § 2808a, the potential award of a future Other Transaction may result in the award of a follow-on contract or transaction for site preparation and construction without the use of competitive procedures, provided that the initial transaction was competitively awarded, the participant(s) successfully completed the project, and the follow-on is for the same or similar scope of work. Therefore, upon determination that the participant(s) in the transaction successfully completed the design project provided for in the transaction, or in the event that a particularly favorable or unexpected result is accomplished that justifies transition to production, this design project may result in the award of a follow-on contract for advancement to Issue for Construction (IFC) status, site preparation, construction, commissioning, and transition without the use of competitive procedures. This RFS is for a contemplated OTA that, if awarded, will be awarded in accordance with 10 U.S.C. § 2028a, Facility construction or repair: transactions other than contracts and grants. Interest & Question Submittal Deadline: 7 AUG 2026 / 1500CDT 18 August 2026: Update has been made to the .pdf attachment RFS to correct typographical errors wherein an incorrect citation was used (10 U.S.C. 2028a). Those errors have been corrected to 10 U.S.C. 2808a. Proposal Due Date/Time: extended to 28 August 2026 / 1600CT

Attachments

5 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Steffanie L. Adams
Primary
steffanie.l.adams.civ@army.mil
Phone: 5206930043
Mallory Schmitt
Secondary
mallory.d.schmitt.civ@army.mil
Phone: 5206929882

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.