Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityClosed

GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado

AGRICULTURE, DEPARTMENT OF › FOREST SERVICE › USDA FOREST SERVICE

Response deadlineSep 15, 2026 5:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 15, 2026 5:00 PM EDT
Posted
Sep 1, 2026 12:00 AM EDT
Notice type
Combined Synopsis/Solicitation
PSC
Z2ND — Repair Or Alteration Of Sewage And Waste Facilities
Place of performance
Leadville, Colorado
Current status
Closed

Notice details

Official status
Closed
Normalized group
Bid opportunity
Notice ID
45da2315471644c488e3e9a3c3604e6f
Solicitation number
1240LT26Q0107

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 3, 2026 10:24 PM EDT.

On September 1, 2026, amendment 0001 to solicitation 1240LT26Q0107 - GAOA LDV Crystal Lakes Water & Septic Resuscitation at Pikes National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240LT26Q0107. 2. Post pre-bid sign in sheet labeled C05b Site Visit 2026.08.19. This SF30 must be acknowledged and submitted with your proposal. ****************************************************************************************************************************************************** This project involves installing a new 2-inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the existing distribution system, replacing the well pump to provide a 15 GPM supply, installing a dual?stage booster pump and basement water storage, and performing associated electrical upgrades such as relocating meters, burying service lines, upgrading panels, and supporting septic and booster pump systems. The project also replaces multiple septic systems serving the Blue House, Brown House, Bunkhouse, and Shop, installs new sewer and dosing infrastructure, and includes asphalt removal along with new road and gate installation.

Attachments

15 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

James Edington
Primary
james.edington@usda.gov

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.