Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityClosing soon

6150--FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV

VETERANS AFFAIRS, DEPARTMENT OF › 261-NETWORK CONTRACT OFFICE 21 (36C261)

Response deadlineAug 21, 2026 3:30 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Aug 21, 2026 3:30 PM EDT
Posted
Aug 19, 2026 12:00 AM EDT
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14)
NAICS
238210
PSC
6150
Place of performance
Reno, Nevada
Current status
Closing soon

Notice details

Official status
Closing soon
Normalized group
Bid opportunity
Notice ID
8baeeff709d9403ca40cdbc99eb71627
Solicitation number
36C26126R0050_0001

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 20, 2026 8:09 PM EDT.

SOLICITATION NO: 36C26126R0050 Amendment 0001 PROJECT TITLE: Project 654-26-020, Building 12 Pump Power Relocation LOCATION: VA Sierra Nevada Health Care System (Reno VAMC), Reno, NV NAICS CODE: 238210 (Electrical Contractors and Other Wiring Installation Contractors) PRODUCT SERVICE CODE (PSC): 6150 (Miscellaneous Electric Power and Distribution Equipment) SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) AMENDMENT 0001 – SOLICITATION UPDATE & PROPOSAL DUE DATE EXTENSION The Department of Veterans Affairs, Network Contracting Office (NCO) 21, is issuing Amendment 0001 to formally amend Request for Proposal (RFP) 36C26126R0050. Due to a system transmission error that delayed the release of previous draft updates, this consolidated amendment formally implements the following updates to the solicitation package: 1. PROPOSAL DUE DATE EXTENSION: The deadline for receipt of proposal packages is formally extended to Friday, August 21, 2026, at 12:30 PM PDT. All technical and price volumes must be submitted electronically via email to the Contract Specialist, Edwin Rivera (edwin.rivera@va.gov). 2. REVISED STATEMENT OF WORK (SOW): Formally deletes the previous SOW V2 and replaces it in its entirety with "SOW Bldg 12 Power Relocation V3, dated August 13, 2026" to clarify physical basement parameters. 3. INCORPORATION OF TECHNICAL BASES: Formally attaches and incorporates the following technical baseline files discussed during the on-site walkthrough: - Attachment 1: Drawing titled "Bldg 12 Basement Pump Power Brief Routing Diagram, dated August 19, 2026" - Attachment 2: Existing Electrical Panel Schedules labeled "MCC Schedules 5-6-22" and "GNHA 9-18-19" (to serve as the baseline for the required post-award panel updates, red lines, and one-line diagram modifications under SOW Section 4). ACKNOWLEDGMENT OF AMENDMENT REQUIRED: Offerors must formally acknowledge receipt of Amendment 0001 prior to the Friday, August 21, 2026, 12:30 PM PDT deadline by completing Item15 of Standard Form 30 (SF-30) and submitting a signed copy with their final proposal package. Failure to acknowledge this consolidated amendment may result in your proposal being determined non-responsive. Except as provided herein, all other terms and conditions of the solicitation remain unchanged and in full force and effect.

Attachments

16 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Edwin Rivera
Primary — Contract Specialist
edwin.rivera@va.gov
Phone: 7757867200

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.