Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
OtherOpen

Child Development Center, Tinker Air Force Base, OK

DEPT OF DEFENSE › DEPT OF THE ARMY › W076 ENDIST TULSA

Response deadlineAug 28, 2026 1:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Aug 28, 2026 1:00 PM EDT
Posted
Aug 13, 2026 12:00 AM EDT
Notice type
Presolicitation
Set-aside
No Set aside used
NAICS
236220
PSC
Y1CZ
Place of performance
Midwest City, Oklahoma
Current status
Open

Notice details

Official status
Open
Normalized group
Other
Notice ID
49a1ecd50f7a4e95a6296e9c5f13b52e
Solicitation number
W912BV26RA016

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 15, 2026 8:02 PM EDT.

1. Action Code: This is a Pre-Solicitation notice. 2. Date: 13 August 2026 3. Contracting Office Address: USACE CEST-CT-E 2488 E. 81st Street Tulsa, Oklahoma 74137-4290 4. PSC Code: Y1CZ – Construction of Other Educational Buildings 5. Subject Title: Child Development Center (CDC), Tinker Air Force Base, Oklahoma 6. Solicitation Number: W912BV26RA016 7. Contact(s) Points: Name: Cheyenne Redemann Daniel A. Foyil Phone: 918-669-7073 918-669-7045 Email: Cheyenne.A.Redemann@usace.army.mil Daniel.A.Foyil@usace.army.mil 8. Important: This notice does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this notice is to provide the pre-solicitation notice required by Revolutionary FAR Overhaul (RFO) 5.101, Presolicitation Notice in preparation for release of the Request for Proposal (RFP) on a later date. 9. Description: The RFP for this project is expected to be issued on or about middle of September 2026. The Proposal due date is planned on or about, end of October 2026. The North American Industry Code Standard (NAICS) is NAICS 236220 – Commercial and Institutional Building Construction, and the size standard is $45.0M. The planned procurement method is contracting by Best Value Trade Off (BVTO). The resulting contract is planned to be a firm-fixed price (FFP) contract for the work described in the Statement of Work which will be provided with the solicitation. The US ARMY CORPS OF ENGINEERS is seeking proposals for a new CDC facility which will accommodate 228 children aged from infant to five-years old, 80 staff members and visitors. The design closely follows prototype facility design as established by the USAF and documented in their facilities criteria FC 4-740-14F as the basis of design. The design includes nine Infant/Pre-Toddler Activity Rooms, six Toddler Activity Rooms, and three Pre-School Activity Rooms. A commercial kitchen is included with pre-determined kitchen layout and equipment per the prototype design. Laundry areas, administration core, and support spaces are included. The new facility also includes a tornado storm shelter satisfying the requirement of ICC 550 and FEMA Criteria. The selected offeror shall construct the project in accordance with the plans and specifications. 10. Place of Contract Performance: Tinker AFB, Oklahoma. 11. Set Aside Status: This will be Unrestricted, Full and Open Competition. 12. Additional Details: THIS SOLICITATION WILL BE OFFERED IN ELECTRONIC FORMAT ONLY. NO HARD COPIES WILL BE PROVIDED. Offerors can view and/or download the RFP and attachments at Procurement Integrated Enterprise Environment (PIEE) Solicitation Module (https://piee.eb.mil) when the RFP is posted. This will be the only method of amendment distribution; therefore, it is the OFFERORS’ RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. Prospective Offerors MUST register themselves on the website. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://www.sam.gov in order to participate in this procurement. Interested parties can register under the Interested Vendors List at SAM.gov. 13. Period of Performance (POP): The POP is estimated to be 732 days after the Notice to Proceed. 14. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests.

Attachments

1 attachment reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Cheyenne Redemann
Primary
cheyenne.a.redemann@usace.army.mil
Phone: 9186697073
Daniel Foyil
Secondary
Daniel.A.Foyil@usace.army.mil
Phone: 9186697045
Fax: 9186697495

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.