Bid opportunityClosing soon
Carbon Filter Pellet Removal and Replacement- Amendment 3
DEPT OF DEFENSE › DEPT OF THE AIR FORCE › FA5000 673 CONS LGC
Response deadlineAug 28, 2026 8:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 28, 2026 8:00 PM EDT
- Posted
- Aug 25, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 335991
- PSC
- 4230
- Place of performance
- Alaska
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Bid opportunity
- Notice ID
- 2641f149c4f74590b1870e8578e0e0ef
- Solicitation number
- FA500026Q0037
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 26, 2026 5:17 PM EDT.
The 3rd Maintenance Squadron (3rd MXS) Fabrication Flight, located at Joint Base Elmendorf-Richardson (JBER), AK, requires professional carbon filter media with installation and disposal of spent carbon for air filtration systems in Building 6263 and Building 9696. • The Corrosion Facility (Bldg. 6263) operates three paint booths requiring a total of 440 filters. This setup includes two small paint booths that need enough carbon pellets to fill 160 filters total (80 per booth). The filters for these small booths measure 20" L x 3" W x 20" H. Additionally, the facility houses one large paint booth that requires carbon pellets to fill 280 filters, which measure 24" L x 3" W x 24" H. • The ASMLO Facility (Bldg. 9696) consists of four aircraft bays requiring a total of 792 filters. All filters utilized in the ASMLO facility are identically sized. Each of the four bays requires 198 large filters, all measuring 24" L x 3" W x 24" H. Requirement: 1. Carbon Media delivery and installation of 34,000 lbs of 4mm particle carbon pellets. 2. Removal and disposal of spent carbon in accordance with all local, state and federal regulations. 3. Installation of new carbon must strictly adhere to the Original Equipment Manufacturer (OEM) instructions. 4. Contractor is responsible for furnishing all equipment and specialized tools required to complete the maintenance. 5. The contractor shall provide all labor, materials, equipment, and tools necessary to perform a bulk carbon filter exchange.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.