Free Beta: Procurement discovery is free; verify every opportunity on SAM.gov. Source status
Bid opportunityOpen

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

DEPT OF DEFENSE › DEPT OF THE ARMY › W071 ENDIST PORTLAND

Response deadlineSep 18, 2026 6:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Sep 18, 2026 6:00 PM EDT
Posted
Aug 19, 2026 12:00 AM EDT
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
237310
PSC
Y1LB
Place of performance
Cascade Locks, Oregon
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
649dc0a978a341069f1a42f2fbd0a736
Solicitation number
W9127N26BA024

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Aug 20, 2026 8:09 PM EDT.

The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4˝” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.

Attachments

2 attachments reported by SAM.gov

Files are hosted by SAM.gov. Open the official notice to review and download them.

View attachments on SAM.gov (opens in a new tab)

Contacts

Christopher Burroughs
Primary
christopher.d.burroughs@usace.army.mil
Justin Figueredo
Secondary
Justin.F.Figueredo@usace.army.mil

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

Document analysis pending

Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.