- Oct 12, 2026 2:00 PM EDT · 6 days left
- Posted
- Sep 9, 2026 12:00 AM EDT
- Notice type
- Sources Sought
- Set-aside
- Not provided or not applicable
- PSC
- 9640 — Iron and Steel Primary and Semifinished Products
- Place of performance
- Not specified
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Market research
- Notice ID
- 40e79685012742daa2b21119bf5c2b5b
- Solicitation number
- W9127827RA006
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 10, 2026 10:24 PM EDT.
This is a Sources Sought Notice for information on capability and availability of potential contractors interested in proposing on a Firm-Fixed Price (FFP) Single Award Task Order Contract (SATOC) to fabricate and deliver contract to manufacture eight (8) new replacement cast steel sluice gates for the Allatoona Dam in Cartersville, Georgia. The delivery location is Allatoona Dam, Allatoona Dam Road SE, Cartersville, GA 30121. The anticipated delivery date/timeframe is Summer 2027. The Statement of Work includes the following: The U.S. Army Corps of Engineers (USACE), Mobile District, requires a fabricate and deliver contract to manufacture eight (8) new replacement cast steel sluice gates for the Allatoona Dam in Cartersville, Georgia. The contractor will be responsible for casting, machining, testing, and delivering new gates that match the existing gate dimensions of five-foot and eight-inches wide by ten-foot and zero inches high (as-builts attached for reference only). Due to the intricate structural ribbing and variable cross-sectional thicknesses of the original design, the new gates require highly complex casting to ensure proper form, fit, and function within the dams existing embedded infrastructure. The contractor will then be required to deliver to the Government after acceptance.
Attachments
No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.
Contacts
Geoffrey Rogers
Primary
geoffrey.b.rogers@usace.army.milErica Collins
Secondary
Erica.M.Collins@usace.army.milPersonalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.