DHS FLETC GLYNCO - TSA ACADEMY RENOVATION
HOMELAND SECURITY, DEPARTMENT OF › FEDERAL LAW ENFORCEMENT TRAINING CENTER › FLETC GLYNCO PROCUREMENT OFFICE
Response deadlineAug 28, 2026 4:30 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 28, 2026 4:30 PM EDT
- Posted
- Aug 18, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 236220
- PSC
- Z2EZ
- Place of performance
- Brunswick, Georgia
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Bid opportunity
- Notice ID
- d46530c1bbcc416784e9a9d8b3fa4e26
- Solicitation number
- 70LGLY26QGLB00040
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 19, 2026 8:09 PM EDT.
THE ORIGINAL FORM HAS BEEN PUT BACK FOR BIDDING PURPOSES - NOTE THAT THE SUBMISSION DATE WAS UPDATED BY AMENDMENT 1 AMENDMENT 2 - GOV'T RESPONSE TO CONTRACT QUESTIONS AND UPDATED ATTACHMENTS AMENDMENT 1 - PUSH PROPOSAL DATE OUT TO THE 28 AUG 2026. AN ADDITIONAL AMENDMENT WILL BE PUBLISHED THIS AFTERNOON ANSWER SUBMITTED QUESTIONS ON THIS ACTION. The TSA Training Academy, located within FLETC Glynco, requires comprehensive facility upgrades across its modular buildings. The need for this procurement arose from aging infrastructure, accessibility requirements, and the need to improve energy efficiency and security. The project includes HVAC replacement, ceiling and canopy fan installation, steel door replacement, ADA ramp installation/modification, concrete work, and drainage improvements. Functions to be performed: • Replace 105 wall-mounted package HVAC units (various sizes with coated coils, heat pumps, and heat strips) • Install 134 ceiling fans and one 12-foot outdoor canopy fan • Replace exterior doors with steel double doors (with view ports) and FLETC OSPR-specified locks • Install ADA ramps at four buildings and modify one ramp for improved accessibility • Repair soft floor spots in two modular buildings • Install ~6,000 sq. ft. of 4-inch concrete for the bleacher area under the canopy • Clean trench drains adjacent to the canopy SEE ATTACHED SYNOPSIS/SOLICITATION AND ASSOCIATED ATTACHMENTS (1-7)
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.