OtherOpen
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI
Response deadlineSep 10, 2026 4:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 10, 2026 4:00 PM EDT
- Posted
- Aug 24, 2026 12:00 AM EDT
- Notice type
- Presolicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 237310
- PSC
- Y1LB
- Place of performance
- Tishomingo, Oklahoma
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Other
- Notice ID
- bd0352bf7a86459287bd9798acbda395
- Solicitation number
- 6982AF27B000003
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 25, 2026 5:16 PM EDT.
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: OK FW TSM 10(1) PROJECT NAME: NFH Entrance Road and Parking Improvements PROJECT DESCRIPTION: The Tishomingo National Fish Hatchery (NFH) is in south-central Oklahoma off SH 7 on a 220-acre U.S. Fish and Wildlife Service (FWS) facility approximately 8 miles northwest of the Town of Tishomingo. The project will address deteriorated pavement for the entrance loop, adding a small parking area at the northeast corner of the entrance loop, and pavement of the entrance road and parking area south of HWY 7. The 3R project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp. SCOPE OF THE WORK: The project will consist of full depth reclamation of the existing roads asphalt to a depth of 6-in, paving 3-in of asphalt, super elevation correction, and culvert replacement. New parking areas will be constructed with new aggregate base and asphalt pavement. A concrete ABA compliant curb ramp and ABA compliant parking spot. Concrete aprons will be placed around existing structures to match existing. Two new gates at the entrances to the NFH will also be installed. Entrance roads and parking areas will be closed during construction. PRINCIPAL WORK ITEMS: 30402-5300 Full Depth Reclamation Method 2, 6-inch depth: 6,800 SQYD 40301-0100 Asphalt Concrete Pavement, 1,250 TON 20401-0000 Roadway Excavation, 400 CUYD ANTICIPATED SCHEDULE: Advertisement – September 2026 Award - November 2026 Construction – June 2027 through October 2027 ESTIMATED COST RANGE: Between $700,000 and $2,000,000
Contacts
Eric Grosskreuz
Primary
cflcontracts@dot.govJorey Deml
Secondary
cflcontracts@dot.govPersonalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.