OtherOpen

HI FLAP CR562(1) Kilauea Point

TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI

Response deadlineNot provided
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Not provided or not applicable
Posted
Oct 15, 2026 12:00 AM EDT
Notice type
Presolicitation
Set-aside
No Set aside used
PSC
Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Kilauea, Hawaii
Current status
Open

Notice details

Official status
Open
Normalized group
Other
Notice ID
dc14203ba77443638a2488066e588f26
Solicitation number
6982AF27B000008

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Oct 17, 2026 12:11 AM EDT.

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NAME: HI FLAP CR562(1) Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook. The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles. PRINCIPAL WORK ITEMS: 18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE: Advertise: End of October or Early November 2026 Bid Opening: December 2026 Award: January 2027 Construction: January 2027 –January 2028 ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.

Attachments

No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.

Contacts

Stephanie Navarro
Primary
cflacquisitions@dot.gov
Ryan Phillips
Secondary
cflacquisitions@dot.gov

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.