OtherOpen
HI FLAP CR562(1) Kilauea Point
TRANSPORTATION, DEPARTMENT OF › FEDERAL HIGHWAY ADMINISTRATION › 6982AF CENTRAL FEDERAL LANDS DIVISI
Response deadlineNot provided
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Not provided or not applicable
- Posted
- Oct 15, 2026 12:00 AM EDT
- Notice type
- Presolicitation
- Set-aside
- No Set aside used
- PSC
- Y1LB — Construction Of Highways, Roads, Streets, Bridges, And Railways
- Place of performance
- Kilauea, Hawaii
- Current status
- Open
Notice details
- Official status
- Open
- Normalized group
- Other
- Notice ID
- dc14203ba77443638a2488066e588f26
- Solicitation number
- 6982AF27B000008
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Oct 17, 2026 12:11 AM EDT.
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NAME: HI FLAP CR562(1) Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook. The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles. PRINCIPAL WORK ITEMS: 18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE: Advertise: End of October or Early November 2026 Bid Opening: December 2026 Award: January 2027 Construction: January 2027 –January 2028 ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.
Attachments
No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.
Contacts
Stephanie Navarro
Primary
cflacquisitions@dot.govRyan Phillips
Secondary
cflacquisitions@dot.govPersonalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.