Market researchClosed
Turnkey Eaton UPS Replacement & Installation
DEPT OF DEFENSE › DEPT OF THE ARMY › W7NT USPFO ACTIVITY NDANG 119
Response deadlineSep 8, 2026 2:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 8, 2026 2:00 PM EDT
- Posted
- Sep 3, 2026 12:00 AM EDT
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- PSC
- 6110 — Electrical Control Equipment
- Place of performance
- Fargo, North Dakota
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Market research
- Notice ID
- 1bf10e971df4404ba91ae657beae64af
- Solicitation number
- W50S88-26-Q-0120
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 5, 2026 10:23 PM EDT.
The 119th Wing (NDANG) in Fargo, ND is conducting market research under FAR Part 10 and FAR Part 12 to identify capable commercial sources (both Small and Large businesses) for a complete turnkey UPS replacement. The purpose of this notice is to determine overall market capability and to identify potential Small Business sources (including 8(a), HUBZone, SDVOSB, and WOSB) for acquisition planning purposes. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No reimbursement will be made for any costs associated with providing information. All interested parties are encouraged to respond. The contractor shall provide all equipment, labor, and licensed electrical services to: Deliver and install a new scalable UPS system in Building 542. Complete startup and connected-load testing. Disconnect, remove, and haul away/recycle the existing Eaton 9155 UPS and two external battery cabinets off-site. Brand Name or Equal Equipment: (1 EA) Eaton 9PXM UPS Frame (9PXM08AAXXX) (2 EA) Eaton 4 kVA Split-Phase Power Module (9PXMSPPM) (6 EA) Eaton Battery Pack (9PXMBAT) (1 EA) Eaton 3U Hardwired Bypass Module (BPM125HW) (1 EA) Gigabit Network Card (NETWORK-M3) (1 EA) 3-Yr Onsite 7x24 Next Day Warranty (WFLN73XX-11000UC) (1 JB) Turnkey Delivery, Installation, Startup, and Disposal Key Technical & Site Specs: Power: 208V Single-Phase / Split-Phase (existing 100A breaker is compatible as-is). Footprint: Max 40" L x 24" W (single rack/tower, hot-swappable batteries, min 20 min runtime @ 1.7 kW load). Site Access: Ground-level entrance, parking within 10 ft of door, 2 exterior steps, under 20 ft total carry distance. Please email a reply (email body or attachment) with the following 4 items: Company & Size Info: Company Name, CAGE Code, UEI, POC, and Business Size (Small or Large Business) under NAICS 238210/335999 (including any socioeconomic categories: 8(a), HUBZone, SDVOSB, WOSB). Electrical Capability: Confirm you have licensed electrical support (ND license or reciprocal state) available to perform the on-site work in Fargo, ND. Delivery Lead Time: Estimated equipment lead time in calendar days After Receipt of Order (ARO). Product Offered: Eaton brand or "or equal" (attach standard spec sheet if proposing "or equal" if possible). Response Deadline Due Date: 8 Sep 2026 at 1:00 PM CST Submit via Email To: Rachel Syverson at rachel.syverson@us.af.mil and Brian Erdmann at brian.erdmann@us.af.mil
Attachments
No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.
Contacts
Rachel Syverson
Primary
rachel.syverson@us.af.milBrian L. Erdmann
Secondary
brian.erdmann@us.af.milPersonalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
No major pursuit restriction detected
We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.