Bid opportunityClosing soon
Removal of 2 Half-Walls
STATE, DEPARTMENT OF › US EMBASSY VIENNA
Response deadlineAug 25, 2026 4:00 AM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 25, 2026 4:00 AM EDT
- Posted
- Aug 18, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- Not provided or not applicable
- NAICS
- 238390
- PSC
- Z1AZ
- Place of performance
- Vienna, Wien
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Bid opportunity
- Notice ID
- f7f0aacf040341cabb110273d54d5e7d
- Solicitation number
- 19AU9026Q0011
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 19, 2026 8:09 PM EDT.
This project is for the removal of 2 half-walls in the waiting area at the U.S. Embassy Consulate in 1010 Vienna. Interested parties shall prepare and submit a quotation according to the detailed tender documents that will be published in the next step of procurement/solicitation notice. Tender specifiations: General Contractor for Construction work, Flooring and Electrical Installation The SOW consists but is not limited to the following: Dust Protection: temporary dust screen made of strong plastic sheeting around the demolishing area (floor to ceiling) Site installation & Logistics Complications: City centre, vehicle access, hotel-office building in operation, neighbors, operating hours, restricted working hours, security measures Demolition, removal and disposal of 2 half-walls: concrete bricks (length sum +14.5m, height=1.3m) and adjacent floor in all layers Electrical installations Dismantling of switches, sockets, wiring in half walls and floors before demolition; new switches/sockets/wires to be installed in existing walls. Filling of the area in the floor+ new flooring (screed, impact sound insulation, laminate flooring) Site-Cleaning renovation area and all affected areas in the building Special requirements The work will be carried out in short time slots (incl. night & weekend) while the facility remains in operation and in the presence of the employees and clients who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures Execution periods Indicative construction schedule: 4-5 days in fall 2026
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.