FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA

DEPT OF DEFENSE › DEPT OF THE ARMY › W074 ENDIST JACKSNVLLE

Response deadlineOct 22, 2026 1:00 PM EDT · 15 days left
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.

Key decision factors

Response deadline
Oct 22, 2026 1:00 PM EDT · 15 days left
Posted
Sep 10, 2026 12:00 AM EDT
Notice type
Solicitation
Set-aside
Not provided or not applicable
PSC
Z2KF — Repair Or Alteration Of Dredging Facilities
Place of performance
Not specified
Current status
Open

Notice details

Official status
Open
Normalized group
Bid opportunity
Notice ID
63328b6188c94d4883b5916d8d0ff60b
Solicitation number
W912EP26BA015

Description

Displayed as sanitized plain text from SAM.gov. Retrieved Sep 11, 2026 10:23 PM EDT.

PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring. Work will be divided into a base and two options. BIDS DUE: 22 October 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION. SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $5,000,000.00 and $10,000,000.00. PERIOD OF PERFORMANCE: The Contractor shall be required to (a) commence work under this contract within SIXTY (60) calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use, and be off the beach, not later than 30 May 2027, with 30 June 2027 for the entire contract work. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 7 January 2027. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

Attachments

No attachments were reported for this notice. MaroNest reflects only what the source data reports — review the official SAM.gov notice (opens in a new tab) to confirm whether related documents or amendments exist.

Contacts

Meredith Gonzalez
Primary
meredith.c.gonzalez@usace.army.mil
Timothy Humphrey
Secondary
Timothy.G.Humphrey@usace.army.mil

Personalized relevance

Would this fit your company?

Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.

Create Free Account

Pursuit risk (separate from your match score)

No major pursuit restriction detected

We did not detect a major source or competition restriction in the information analyzed. This is not an eligibility determination.

Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.