Bid opportunityClosing soon
Theater Rigging Control System Modernization
LIBRARY OF CONGRESS › CONTRACTS SERVICES
Response deadlineAug 26, 2026 12:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Aug 26, 2026 12:00 PM EDT
- Posted
- Aug 17, 2026 12:00 AM EDT
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 334310
- PSC
- J040
- Place of performance
- Washington, District of Columbia
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Bid opportunity
- Notice ID
- e93b0d4fdd3a40b1b45b15e98455db02
- Solicitation number
- 030ADV26R0048
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 20, 2026 8:09 PM EDT.
The Library of Congress (Library) requires contract support to modernize the theatrical rigging control systems for the historic Coolidge Auditorium. The 485-seat venue opened in the 1920’s, designed with acoustic properties to support chamber music. The venue began to support other types of performances, in addition to other types of events. To support increased use, modernization was performed in the mid-1990’s which added motorized theatrical rigging and automation. The legacy infrastructure and system added in the 1990’s was installed by Wenger/JR Clancy, and is characterized by distributed control points, variable motor behavior, and limited system intelligence. The control unit for the system has been inoperable for over a year. The installed infrastructure reflects a rigging ecosystem in which motorized scenic elements were deployed as semi-independent subsystems with limited interoperability and with centralized control unit. At present, these subsystems can only be operated using standalone manual override stations, which are still operable for each component. This modernization effort is intended to unify these systems into a single theater rigging control environment and replace the non-working control unit. All work shall comply with historic preservation constraints, structural limitations, and restricted installation practices typical of protected performance venues. The Contractor shall remove the current theatrical rigging control system and provide a new theatrical rigging control system for the Library’s Coolidge Auditorium. Amendment 0001 The purpose of this amendment is to provide answers to questions. See attached amendment and Q&A document.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Document analysis pending
Some solicitation documents have not been analyzed yet. Additional restrictions may still be present.
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.