Bid opportunityClosing soon
Amendment 1 to 7 Ultrasonic Flowmeters
COMMERCE, DEPARTMENT OF › NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY › DEPT OF COMMERCE NIST
Response deadlineSep 4, 2026 12:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 4, 2026 12:00 PM EDT
- Posted
- Aug 28, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Not provided or not applicable
- NAICS
- 334516
- PSC
- 6640
- Place of performance
- Gaithersburg, Maryland
- Current status
- Closing soon
Notice details
- Official status
- Closing soon
- Normalized group
- Bid opportunity
- Notice ID
- c57fd080570247528e4049abe26cec79
- Solicitation number
- 1333ND26QNB610465
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Aug 29, 2026 5:17 PM EDT.
Amendment 1to RFQ 1333ND26QNB610465 Clarification questions: Vendor Question 1: Could you please confirm the solids content (TSS) of the water? If this is clean water, with less than 2% TSS, please let us know so we can determine the appropriate unit for the application. NIST Response: This water is moderately clean, not a slurry (2% TSS is closer to wastewater) but not filtered Vendor Question 2: The factory has confirmed that no software is required to configure the meter, as very few ultrasonic meters require software for configuration. NIST Response: PC-based data logging is a nice-to-have but not a necessity. Vendor Question 3: (clarification on the following process conditions for the primary and secondary cooling systems) Operating temperature of the process fluid (or pipe surface temperature) at the measurement points, for both the primary and secondary cooling loops. This determines whether standard or high-temperature transducers are required. NIST Response: No higher than 114 degrees Fahrenheit. Vendor Question 4: (clarification on the following process conditions for the primary and secondary cooling systems) Operating pressure of the cooling water at the measurement points (primary and secondary). NIST Response: No higher than 10 psia. Vendor Question 5: (clarification on the following process conditions for the primary and secondary cooling systems) Confirmation of the process fluid — the SOW references cooling water; please confirm it is treated water with no significant entrained solids or aeration that could affect ultrasonic signal transmission. NIST Response: Primary – Heavy water, purified. Secondary - Water with minimal solids. Some algae to be expected but not significant. As defined in the attached Combined Synopsis Solicitation, Statement of Work and RFO Provisions and Clauses.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Review before pursuing
We found a requirement that may limit who can compete. Review the solicitation details before proceeding.
Detected in
- Solicitation document“e necessary for the installation, calibration, diagnostics, and troubleshooting shall be provided by the contractor. Software shall be an effectively permanent license. Software shall be compatible with Windows operating”
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.