Bid opportunityClosed
Paging System Upgrade Expansion
VETERANS AFFAIRS, DEPARTMENT OF › 252-NETWORK CONTRACT OFFICE 12 (36C252)
Response deadlineSep 18, 2026 5:00 PM EDT
View official notice on SAM.gov ↗ (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice.
Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 18, 2026 5:00 PM EDT
- Posted
- Sep 14, 2026 12:00 AM EDT
- Notice type
- Solicitation
- PSC
- 5975 — Electrical Hardware and Supplies
- Place of performance
- Madison, Wisconsin
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Bid opportunity
- Notice ID
- 62bf936176f141cd9505eab1de6325a4
- Solicitation number
- 36C25226Q0711
Description
Displayed as sanitized plain text from SAM.gov. Retrieved Sep 15, 2026 10:23 PM EDT.
Madison VA Hospital is seeking Fiber Optic Cable with installation for the paging system upgrade and expansion. Provide, install, and test a dedicated, independent, underground fiber connection consisting of a 6-strand indoor/outdoor armored plenum single-mode (OS2) fiber optic cable, accessories, and installation to Bldgs. 4 and 12, a dedicated, independent, underground fiber connection consisting of a 6-strand indoor/outdoor plenum single-mode (OS2) fiber optic cable, accessories, and installation to Bldgs. 2, 5, 6, and 7 (materials except for SMURF Tubes furnished by the government (GFE)), and a dedicated, independent fiber connection consisting of a 18 or 24-strand indoor armored plenum single-mode (OS2) fiber optic cable(s), accessories, and installation from C-Wing Core (Rm. C-125) to the Penthouse. Fiber will be run using existing trenches/pathways (including those used by Federal Electronic Health Record (FEHR) and other fiber, where possible). Includes 1U fiber drawers and LC terminations (as needed), and project management. Contractor will use SMURF Tube to protect GFE provided non-armored fiber inside buildings. Fiber should terminate in the same room as the paging/network equipment in each building. Demark terminating at Bldg. 1 is C125 patch panel, run fiber optic above ceiling tiles in C125. Patch panels must be properly labeled. See attached RFQ 36C25226Q0711 for more details.
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free Account
Pursuit risk (separate from your match score)
Review before pursuing
We found a requirement that may limit who can compete. Review the solicitation details before proceeding.
Detected in
- Solicitation document“erience in adherence to current industry standards. Installers and subcontractors will be properly supervised by contractor to ensure quality of work. Materials and installation shall be compatible with current equipment”
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.
Same solicitation, other stages
Related procurement history
Other public MaroNest records that share this exact SAM.gov agency and solicitation number, including presolicitation notices, amendments, and award outcomes. Verify amendment/award relationships on the official SAM.gov notice.