Bid opportunityClosed
Lieutenant Colonel Lionel A. Jackson (LTC LAJ) Condensers Replacement
DEPT OF DEFENSE › DEPT OF THE ARMY › W7RQ USPFO ACTIVITY VI ARNG
Response deadlineSep 22, 2026 12:00 PM EDT
View official notice on SAM.gov (opens in a new tab)
Verify before acting. Users must verify deadlines, amendments, attachments, eligibility, and submission requirements on the official SAM.gov notice. Read the Data Disclaimer.
Key decision factors
- Response deadline
- Sep 22, 2026 12:00 PM EDT
- Posted
- Sep 21, 2026 12:00 AM EDT
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- PSC
- J041 — Maintenance, Repair and Rebuilding of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
- Place of performance
- St Croix, N/A
- Current status
- Closed
Notice details
- Official status
- Closed
- Normalized group
- Bid opportunity
- Notice ID
- f3f8fa685881440f9978d15fc1ad59c2
- Solicitation number
- W9127P26QA038
Description
Full description is not currently available in MaroNest. Review the official SAM.gov notice for complete requirements.
Attachments
7 attachments reported by SAM.gov
Files are hosted by SAM.gov. Open the official notice to review and download them.
Contacts
Personalized relevance
Would this fit your company?
Create company profile information with a free account to see a deterministic, explainable relevance score. Matching does not determine eligibility or win probability.
Create Free AccountPursuit risk (separate from your match score)
Review before pursuing
We found a requirement that may limit who can compete. Review the solicitation details before proceeding.
Detected in
- Solicitation document“ible source: x Vendor: Bonderite, Trane & Gree, or similar. 3. Nature of the Acquisition & Justification A brand-name justification is encouraged but not required: x Compatibility & Integration: The Bonderite, Trane & Gr”
- Solicitation document“General. The objective is to furnish the building with fully functional condensing units that provide controlled air to the designated offices or drill hall. The condensing unit must be compatible with the existing air h”
Pursuit risk is evaluated separately from your match score above and never changes it. This is not a legal or eligibility determination — verify against the official SAM.gov notice and attachments.